Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Baprola, Delhi. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Baprola at a glance for solar projects
| District and state | West district, Delhi |
|---|---|
| Electricity supply | BSES Rajdhani Power Limited (BRPL) supplies Baprola, which the cited source places in its supply area. |
| Electricity regulator | Delhi Electricity Regulatory Commission (DERC) |
| State renewable energy agency | Energy Efficiency and Renewable Energy Management Centre, Department of Power, Government of NCT of Delhi (EE&REM Centre) |
| State solar policy | Delhi Solar Energy Policy, 2023 (notified 14 March 2024; valid until 31 March 2030 unless replaced earlier) |
| Rooftop metering for businesses | Net metering from 1 kWp, with plant size linked to the sanctioned load |
| Modelled solar output | about 1,420 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 40 km from Baprola in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Baprola
In Delhi, rooftop solar connects under net metering. DERC's Net Metering for Renewable Energy Regulations, 2014 apply to consumers who buy electricity from a distribution licensee, and the solar policy confirms that this includes commercial and industrial consumers. The plant must be at least 1 kWp. Its size is subject to the sanctioned load, the capacity of the service line and the feasibility of connecting to the grid.
- The 2014 regulations provide net metering only. They have no separate net billing or gross metering arrangement.
- A plant larger than the sanctioned load is allowed if the consumer pays the difference in Service Line cum Development charges.
- Each distribution licensee must offer at least 20% of the rated capacity of a distribution transformer for net-metered plants.
- Surplus units carry forward to the next billing period as energy credit. Credits left at the end of the financial year are paid by the licensee at rates notified by DERC.
- Group net metering is open to all consumers, and since 20 January 2026 virtual net metering is too. A ground-mounted plant under either may be up to 5 times the sanctioned load of the participating consumers, with a maximum of 10 MW. Rooftop plants have no cap. Plants commissioned by 31 March 2027 under these guidelines pay no wheeling charge, banking charge or cross-subsidy surcharge for their useful life.
- Peer-to-peer trading of rooftop solar power is allowed under DERC's 2024 guidelines for consumers and prosumers with a sanctioned load or contract demand of up to 200 kW. Ground-mounted projects are excluded.
- Latest amendment: the Net Metering (Second Amendment) Guidelines of 16 July 2026. The process is now online and in two stages. The licensee must grant connectivity within 25 days for plants above 10 kW, not counting the time the consumer takes to install the plant.
In Baprola the application for connection and metering goes to BRPL.
What a plant produces in Baprola
A solar plant in Baprola is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial energy charge of ₹7.75 per kVAh (DERC Tariff Order for FY 2021-22, dated 30 September 2021, in force from 1 October 2021 and still the prevailing order in November 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The tariff schedule has one Industrial category, with the same rate in the BRPL, BYPL, TPDDL and NDMC areas. A fixed charge of ₹250 per kVA per month also applies. Supply at 11 kV gets a 3% rebate on energy charges. Time-of-day rates apply to consumers other than domestic with a sanctioned load of 10 kW/11 kVA or more. BRPL, BYPL and TPDDL bills also carry surcharges of 8% and 7% on fixed and energy charges, and a fuel and power purchase adjustment surcharge (FPPAS).
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.75 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹11.0 lakh |
| 500 kW | 7.1 lakh units | 5,000 sq m | ₹55.0 lakh |
| 1 MW | 14.2 lakh units | 10,000 sq m | ₹1.10 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Baprola
The Government of India's One District One Product (ODOP) list names Furniture items as the product of West district.
EPC projects by Somaya Solar near Baprola
These are the Somaya Solar projects closest to Baprola, with straight-line distances. They are shown as references and are not in Baprola unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 140 km from Baprola. In progress. Site access was difficult and was handled with local support.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 180 km from Baprola. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 180 km from Baprola. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Baprola
Which electricity company handles solar connections in Baprola?
BSES Rajdhani Power Limited (BRPL) supplies Baprola, which the cited source places in its supply area.
Is net metering available for factories and commercial buildings in Baprola?
In Delhi, rooftop solar connects under net metering. DERC's Net Metering for Renewable Energy Regulations, 2014 apply to consumers who buy electricity from a distribution licensee, and the solar policy confirms that this includes commercial and industrial consumers. The plant must be at least 1 kWp. Its size is subject to the sanctioned load, the capacity of the service line and the feasibility of connecting to the grid.
How much electricity does a solar plant generate in Baprola?
About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Baprola?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 40 km from Baprola in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 140 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Baprola
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- BRPL: source naming Baprola within its supply area
- DERC (Net Metering for Renewable Energy) Regulations, 2014, with the First Amendment Regulations of 26 July 2024, the Net Metering Guidelines as amended to 16 July 2026, the Group and Virtual Net Metering Guidelines, 2019 as amended to 20 January 2026, and the Peer to Peer Energy Transaction Guidelines of 24 June 2024
- DERC Tariff Order for FY 2021-22 (BSES Rajdhani Power Limited), dated 30 September 2021, Tariff Schedule; DERC order of 10 November 2026 on the fuel and power purchase adjustment surcharge
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- Delhi Electricity Regulatory Commission
- Delhi Gazette Extraordinary Part IV, Revenue Dept notification F.223/SDM-II(HQ)/Land/2025/285 of 25 Dec 2025 (Tables I and II), revenue.delhi.gov.in
- Delhi Solar Energy Policy, 2023 (Delhi Gazette, 14 March 2024) with the First Amendment (10 July 2025) and the Second Amendment (Delhi Gazette, 17 September 2026)
- Delhi Solar Energy Policy, 2023 (Department of Power, Government of NCT of Delhi; Delhi Gazette, 14 March 2024)
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)