Somaya Solar Solutions Limited delivers turnkey solar projects in Barnala, Punjab: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Barnala

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier (PSPCL) for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Barnala

In Punjab, commercial and industrial consumers can use net metering for a rooftop plant from 1 kWp up to their sanctioned load or contract demand, with a ceiling of 500 kWp. The regulator set this in the third amendment to its 2021 rooftop regulations, notified on 7 April 2026. Before that, a non-domestic consumer could install only up to 70% of the sanctioned load.

The size limits, charges and other conditions for Punjab are on the page Turnkey Solar EPC in Punjab.

In Barnala the application for connection and metering goes to PSPCL.

What to expect from the plant in Barnala

A solar plant in Barnala is modelled to produce about 1,410 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Supply industrial, General Industry, above 100 kVA and up to 1,000 kVA (11 kV or higher) energy charge of ₹5.90 per kVAh (PSERC tariff order for PSPCL for 2026-27, dated 6 March 2026, in force from 1 April 2026 to 31 March 2027). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Above 1,000 kVA the energy charge is ₹6.00 per kVAh. Fixed charges also apply: ₹210 per kVA per month up to 1,000 kVA and ₹280 above that. Time-of-day rates apply: ₹2.00 per kVAh extra from 6 PM to 10 PM between 16 June and 15 October, and a night rebate from 10 PM to 6 AM of ₹0.50 per kVAh (1 April to 15 June) or ₹1.00 per kVAh (16 October to 31 March). A fuel and power purchase adjustment surcharge is added. The order applies to PSPCL, the distribution licensee for Punjab.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹5.90 per kVAh
100 kW1.4 lakh units1,000 sq m₹8.3 lakh
500 kW7.0 lakh units5,000 sq m₹41.6 lakh
1 MW14.1 lakh units10,000 sq m₹83.2 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Reference projects near Barnala

These are the Somaya Solar projects closest to Barnala, with straight-line distances. They are shown as references and are not in Barnala unless the line says so.

  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 250 km from Barnala. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 260 km from Barnala. Included net-metering coordination with the local electricity distribution company.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 330 km from Barnala. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Barnala

Which electricity company handles solar connections in Barnala?

Punjab State Power Corporation Limited (PSPCL) is the distribution utility for Punjab and supplies Barnala district.

Is net metering available for factories and commercial buildings in Barnala?

Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Punjab.

How much electricity does a solar plant generate in Barnala?

About 1,410 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.1 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Barnala?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 270 km from Barnala in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 250 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Barnala

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image