Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Begampur, Delhi as an EPC contractor: engineering, supply, construction and commissioning.

What Delhi's policy says about large solar plants

The Delhi Solar Energy Policy, 2023 is Delhi's current solar policy. The Delhi government notified it on 14 March 2024 and amended it on 10 July 2025 and 17 September 2026. The second amendment keeps the policy valid until 31 March 2030 unless another policy replaces it. It also limits the generation-based incentive for new systems to commercial and industrial consumers. The policy covers solar systems of 1 kWp or more.

  • Target: 4,500 MW of installed solar capacity by 2026-27. This is 750 MW of rooftop solar inside Delhi and about 3,750 MW of utility-scale solar from outside Delhi.
  • The Energy Efficiency and Renewable Energy Management (EE&REM) Centre of the Department of Power is the state nodal agency for the policy.
  • Commercial and industrial consumers get a generation-based incentive of ₹1 per kWh for five years from commissioning. It is offered for the first 200 MW installed, so check with the distribution company that it is still open.
  • Exported units left after net metering roll over to later billing cycles for up to 12 months, until the end of the financial year. Solar plants up to 500 kVA are exempt from inspection by the Electrical Inspector.
  • Group net metering, virtual net metering and peer-to-peer trading follow the regulations and guidelines of DERC.

Under DERC's Green Energy Open Access Regulations, 2024, as amended in 2026, a consumer with a contract demand or sanctioned load of 100 kW or more can take renewable power through open access. The 100 kW can be one connection or several connections in the area of the same distribution licensee.

  • The first amendment, dated 17 June 2026 and published in the Delhi Gazette on 18 August 2026, removed the earlier condition that the consumer be connected at 11 kV or above.
  • A consumer with a captive generating plant has no load limit. Captive use pays no cross-subsidy surcharge and no additional surcharge.
  • Banking is allowed at least monthly. The banking charge is 8% of the banked energy, taken in units. Banked energy cannot be carried to the next billing cycle; unused units lapse.
  • The additional surcharge does not apply up to the contract demand the consumer keeps with the distribution licensee. Where it applies, it reduces each year and ends within four years of the grant of open access.
  • The tariff order in force (FY 2021-22) sets wheeling charges at 11 kV of ₹1.061 per unit for BRPL, ₹1.240 for BYPL and ₹1.017 for TPDDL. It gives no figure for the cross-subsidy surcharge or the additional surcharge, so ask the distribution licensee for the current rates.

Output and land at megawatt scale in Begampur

A solar plant in Begampur is modelled to produce about 1,510 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (32°).

Plant sizeModelled output a yearLand needed (typical)
5 MW75.5 lakh units20 to 25 acres
10 MW1.51 crore units40 to 50 acres
25 MW3.77 crore units100 to 125 acres

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

What utility-scale work involves

At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.

  • Land and grid-connection feasibility
  • Detailed engineering for the plant and the evacuation system
  • Procurement and logistics for modules, inverters, transformers and structures
  • Civil, mechanical and electrical construction with several teams working in parallel
  • Testing, commissioning and connection with the transmission or distribution utility
  • Operation and maintenance, where contracted

More detail: Utility-Scale Solar across India.

Megawatt-scale ground-mounted work by Somaya Solar near Begampur

These are the Somaya Solar projects closest to Begampur, with straight-line distances. They are shown as references and are not in Begampur unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 140 km from Begampur. In progress. Site access was difficult and was handled with local support.
  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 640 km from Begampur. Completed, including the transmission line work coordinated with the local distribution company.

See all published projects

Questions about solar projects in Begampur

Which electricity company handles solar connections in Begampur?

Tata Power Delhi Distribution Limited (TPDDL) supplies Begampur, which the cited source places in its supply area.

How much electricity does a solar plant generate in Begampur?

About 1,510 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.1 lakh units a year. A site study gives the figure to plan on.

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based, and how far is that from Begampur?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 40 km from Begampur in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 140 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Begampur

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.