Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Bhuban, Odisha as an EPC contractor: engineering, supply, construction and commissioning.
What Odisha's policy says about large solar plants
The Odisha Renewable Energy Policy, 2022 is the state's policy for solar and other renewable projects. The Energy Department issued it as a resolution on 30 November 2022. It stays in force until 31 March 2030 or until the state announces a new policy.
Under OERC's Green Energy Open Access Regulations, 2023, a consumer with a contracted demand or sanctioned load of 100 kW or more, on one connection or on several connections added together, can take green energy through open access. A captive consumer has no load limit.
The charges, exemptions and conditions for Odisha are on the page Utility-Scale Solar in Odisha.
Output and land at megawatt scale in Bhuban
A solar plant in Bhuban is modelled to produce about 1,310 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (26°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 65.5 lakh units | 20 to 25 acres |
| 10 MW | 1.31 crore units | 40 to 50 acres |
| 25 MW | 3.27 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Bhuban
These are the Somaya Solar projects closest to Bhuban, with straight-line distances. They are shown as references and are not in Bhuban unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 650 km from Bhuban. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1160 km from Bhuban. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Bhuban
Which electricity company handles solar connections in Bhuban?
TP Central Odisha Distribution Limited (TPCODL) supplies electricity in Dhenkanal district, one of the districts it lists as its area.
How much electricity does a solar plant generate in Bhuban?
About 1,310 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.1 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Bhuban?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1210 km from Bhuban in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 650 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Bhuban
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- OERC common tariff order for TPNODL, TPWODL, TPCODL and TPSODL for 2026-27, 24 March 2026, Table 1 licensed areas (txt-jhod/oerc-discom-order-2627.txt)
- OERC open access charges notification for 2026-27 (letter of 24 March 2026) and OERC (Promotion of Renewable Energy through Green Energy Open Access) Regulations, 2023, notified 27 December 2023
- Odisha Renewable Energy Policy, 2022 (Energy Department resolution No. 11757 of 30 November 2022, Odisha Gazette Extraordinary No. 3354)
- PVGIS, European Commission Joint Research Centre (solar output model)