Output and land for a ground-mounted plant in Bishrampur
A solar plant in Bishrampur is modelled to produce about 1,430 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (29°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 1 MW | 14.3 lakh units | 4 to 5 acres |
| 2 MW | 28.6 lakh units | 8 to 10 acres |
| 5 MW | 71.5 lakh units | 20 to 25 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Jharkhand
The Jharkhand State Solar Policy 2022 is the state's current solar policy. The Department of Energy issued it by resolution dated 5 July 2022. It stays valid for five years from notification unless another policy replaces it.
Under JSERC's Green Energy Open Access Regulations, 2024, a consumer with a contract demand or sanctioned load of 100 kW or more can take renewable power through open access. A captive consumer has no load limit.
The charges, exemptions and conditions for Jharkhand are on the page Ground-Mounted Solar Plant in Jharkhand.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Ground-mounted projects by Somaya Solar near Bishrampur
These are the Somaya Solar projects closest to Bishrampur, with straight-line distances. They are shown as references and are not in Bishrampur unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 360 km from Bishrampur. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 750 km from Bishrampur. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Bishrampur
Which electricity company handles solar connections in Bishrampur?
Jharkhand Bijli Vitran Nigam Limited (JBVNL), the state distribution company, holds a licence covering the whole of Jharkhand, including Palamu district.
How much electricity does a solar plant generate in Bishrampur?
About 1,430 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.3 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Bishrampur?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 810 km from Bishrampur in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 360 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Bishrampur
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- JSERC (Terms and Conditions for Green Energy Open-access) Regulations, 2024, notified 9 May 2024; JSERC order for JBVNL dated 25 March 2026 (chapter 10)
- JSERC order for JBVNL dated 25 March 2026, paragraph 1.14 (saved copy: txt-jhod/JBVNL-2026.txt)
- Jharkhand State Solar Policy 2022 (Department of Energy, Government of Jharkhand, Resolution dated 5 July 2022)
- PVGIS, European Commission Joint Research Centre (solar output model)