Somaya Solar Solutions Limited delivers turnkey solar projects in Daman, Dadra and Nagar Haveli and Daman and Diu: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Daman
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier (DNHDDPDCL) for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Daman
In Dadra and Nagar Haveli and Daman and Diu, a consumer can connect a rooftop, ground-mounted or floating solar plant of up to 500 kWp at one premises under JERC's net metering regulations of 2019, as amended in 2024. A plant above 500 kWp comes under net billing (net feed-in). The plant may not be larger than the consumer's contract demand or sanctioned load. The plant may be owned by the consumer or by a third party.
The size limits, charges and other conditions for Dadra and Nagar Haveli and Daman and Diu are on the page Turnkey Solar EPC in Dadra and Nagar Haveli and Daman and Diu.
In Daman the application for connection and metering goes to DNHDDPDCL.
What to expect from the plant in Daman
A solar plant in Daman is modelled to produce about 1,380 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HTS-IV, 11/33 kV, contract demand above 100 kVA and up to 5,000 kVA) energy charge of ₹4.80 per kVAh (JERC Tariff Order of 25 September 2025 for DNH and DD Power Distribution Corporation Limited (Petition No. 145 of 2025), in force from 1 October 2025, which sets tariffs for each year from 2025-26 to 2029-30. ₹4.80 is the energy charge it approves for 2026-27.). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹455 per kVA per month also applies, billed on the recorded maximum demand or 85% of the contract demand, whichever is higher. A tariff surcharge of 8.77% applies from 1 July 2026 to 31 March 2027 (the 5.00% approved in September 2025 plus 3.77% approved in the JERC true-up order of 16 June 2026). Time-of-day tariff is mandatory for HT consumers, except those with captive power plants or taking wheeled power: 0.8 times the energy charge in solar hours and 1.2 times in peak hours. Supply at 33 kV gets a 3% rebate on the energy charge. Electricity duty, taxes and any fuel and power purchase cost adjustment surcharge are extra. Industrial supply at 66 kV and above with contract demand over 5,000 kVA (EHTS-II) is ₹4.70 per kVAh with a fixed charge of ₹580 per kVA per month. DNHDDPDCL is the only licensee.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹4.80 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹6.6 lakh |
| 500 kW | 6.9 lakh units | 5,000 sq m | ₹33.1 lakh |
| 1 MW | 13.8 lakh units | 10,000 sq m | ₹66.2 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Reference projects near Daman
These are the Somaya Solar projects closest to Daman, with straight-line distances. They are shown as references and are not in Daman unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 870 km from Daman. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1100 km from Daman. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1100 km from Daman. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Daman
Which electricity company handles solar connections in Daman?
Dadra and Nagar Haveli and Daman and Diu Power Distribution Corporation Limited (DNHDDPDCL) supplies Daman, which the cited source places in its supply area.
Is net metering available for factories and commercial buildings in Daman?
Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Dadra and Nagar Haveli and Daman and Diu.
How much electricity does a solar plant generate in Daman?
About 1,380 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.8 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Daman?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1030 km from Daman in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 870 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Daman
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DNHDDPDCL: source naming Daman within its supply area
- GeoNames (place coordinates, CC BY 4.0)
- JERC (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019 (No. JERC-24/2019, notified 24 July 2019) and the Net Metering & Gross Metering (First Amendment) Regulations, 2024 (notified 1 August 2024, Gazette of India 11 September 2024)
- JERC Tariff Order, Truing up for FY 2023-24, APR for FY 2024-25 and ARR and Determination of Tariff for MYT Control Period FY 2025-26 to FY 2029-30, Petition No. 145 of 2025, DNH and DD Power Distribution Corporation Limited, dated 25 September 2025 (Table 10-1), and JERC True-up Order of 16 June 2026 (Petition No. 165 of 2026)
- PVGIS, European Commission Joint Research Centre (solar output model)