Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Dimapur, Nagaland. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Dimapur at a glance for solar projects
| District and state | Dimapur district, Nagaland |
|---|---|
| Electricity supply | Department of Power, Government of Nagaland (DoPN) is the distribution utility for Nagaland and supplies Dimapur district. |
| Electricity regulator | Nagaland Electricity Regulatory Commission (NERC) |
| State renewable energy agency | Department of Power, Nagaland (DoPN) |
| Rooftop metering for businesses | Net or gross metering, 1 kWp to 500 kWp, up to 100% of sanctioned load |
| Modelled solar output | about 1,210 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1640 km from Dimapur in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Dimapur
In Nagaland, grid-connected rooftop solar for all consumers falls under the NERC (Rooftop Solar Grid Interactive System Net/Gross Metering) Regulations, 2019. NERC amended them on 20 May 2024 and again on 29 March 2025.
The size limits, charges and other conditions for Nagaland are on the page Solar EPC Company in Nagaland.
In Dimapur the application for connection and metering goes to DoPN.
What a plant produces in Dimapur
A solar plant in Dimapur is modelled to produce about 1,210 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial (Category B), more than 5,000 kWh a month energy charge of ₹8.25 per kWh (NERC tariff order dated 17 September 2026, in force from 1 October 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The Industrial category is charged in slabs: ₹7.15 up to 500 kWh, ₹7.91 for 501 to 5,000 kWh and ₹8.25 above 5,000 kWh. The schedule shows no separate HT rate. A monthly minimum charge of ₹250 per kVA of contract demand applies. These are the subsidised rates; if the state government's subsidy is not paid in time, DoPN may bill the full cost tariff of ₹10.53 per kWh. Bulk supply is ₹7.75 per kWh. Time-of-day rates for commercial and industrial users: 20% above the normal rate from 6 to 8 AM and 4 to 9 PM, 20% below from 8 AM to 4 PM, and normal from 9 PM to 6 AM. The order approves it provisionally and it needs smart meters. The schedule heading also mentions 1 April 2026, while the rate column covers 1 October 2026 to 31 March 2027.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹8.25 per kWh |
|---|---|---|---|
| 100 kW | 1.2 lakh units | 1,000 sq m | ₹10.0 lakh |
| 500 kW | 6.0 lakh units | 5,000 sq m | ₹49.9 lakh |
| 1 MW | 12.1 lakh units | 10,000 sq m | ₹99.8 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Dimapur
The Government of India's One District One Product (ODOP) list names Pineapple and Bamboo as the products of Dimapur district.
EPC projects by Somaya Solar near Dimapur
These are the Somaya Solar projects closest to Dimapur, with straight-line distances. They are shown as references and are not in Dimapur unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1360 km from Dimapur. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1390 km from Dimapur. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1500 km from Dimapur. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Dimapur
Which electricity company handles solar connections in Dimapur?
Department of Power, Government of Nagaland (DoPN) is the distribution utility for Nagaland and supplies Dimapur district.
Is net metering available for factories and commercial buildings in Dimapur?
Net or gross metering, 1 kWp to 500 kWp, up to 100% of sanctioned load. The rule is the same across Nagaland.
How much electricity does a solar plant generate in Dimapur?
About 1,210 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.1 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Dimapur?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1640 km from Dimapur in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1360 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Dimapur
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- Department of Power, Nagaland: Operational Guidelines for PM-Surya Ghar: Muft Bijli Yojana in Nagaland, which names DoPN as the Nodal Agency for rooftop solar under that scheme
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- NERC (Rooftop Solar Grid Interactive System Net/Gross Metering) Regulations, 2019, with the First Amendment of 20 May 2024 and the Second Amendment of 29 March 2025
- NERC tariff order dated 17 September 2026 (Table 8.3 and Appendix II, approved tariff schedule)
- NERC tariff order dated 17 September 2026, introduction item (d)
- Nagaland Electricity Regulatory Commission (NERC), Kohima
- PVGIS, European Commission Joint Research Centre (solar output model)