Somaya Solar Solutions Limited delivers turnkey solar projects in Dumka, Jharkhand: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Dumka

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier (JBVNL) for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Dumka

In Jharkhand, rooftop solar for any consumer of a distribution licensee, including commercial and industrial consumers, goes through JSERC's Rooftop Solar PV Grid Interactive System and Net/Gross Metering Regulations, 2015. The regulations have been amended seven times. The latest, the Seventh Amendment, was notified on 30 January 2026 and changed only the fees.

The size limits, charges and other conditions for Jharkhand are on the page Turnkey Solar EPC in Jharkhand.

In Dumka the application for connection and metering goes to JBVNL.

What to expect from the plant in Dumka

A solar plant in Dumka is modelled to produce about 1,310 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the High Tension Service (HTS), JBVNL, 6.6 kV and above energy charge of ₹6.40 per kVAh (JSERC tariff order for JBVNL dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹400 per kVA per month also applies. Billing demand is the recorded maximum demand or 75% of contract demand, whichever is higher. The rate for HTSS (induction or arc furnaces of 300 kVA and more) is ₹5.80 per kVAh. Time-of-day billing is an option for HTS consumers: 85% of the rate from 10 PM to 6 AM, 100% from 10 AM to 6 PM and 120% from 6 AM to 10 AM and 6 PM to 10 PM. The order calls these ceiling tariffs. Tata Steel, Tata Steel UISL, DVC and SAIL Bokaro have their own tariff schedules, so rates differ in their areas.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.40 per kVAh
100 kW1.3 lakh units1,000 sq m₹8.4 lakh
500 kW6.5 lakh units5,000 sq m₹41.9 lakh
1 MW13.1 lakh units10,000 sq m₹83.8 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Reference projects near Dumka

These are the Somaya Solar projects closest to Dumka, with straight-line distances. They are shown as references and are not in Dumka unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 700 km from Dumka. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 840 km from Dumka. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 990 km from Dumka. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Dumka

Which electricity company handles solar connections in Dumka?

Jharkhand Bijli Vitran Nigam Limited (JBVNL), the state distribution company, holds a licence covering the whole of Jharkhand, including Dumka district.

Is net metering available for factories and commercial buildings in Dumka?

Net or gross metering for rooftop plants of 1 kWp to 2 MWp, up to 100% of sanctioned load. The rule is the same across Jharkhand.

How much electricity does a solar plant generate in Dumka?

About 1,310 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.1 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Dumka?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1090 km from Dumka in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 700 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Dumka

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image