Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Ellenabad, Haryana.

Ellenabad at a glance for solar projects

District and stateSirsa district, Haryana
Electricity supplyDakshin Haryana Bijli Vitran Nigam Limited (DHBVN) supplies electricity in Sirsa district, one of the districts it lists as its area.
Electricity regulatorHaryana Electricity Regulatory Commission (HERC)
State renewable energy agencyHaryana Renewable Energy Development Agency, under the Department of New & Renewable Energy, Haryana (HAREDA)
State solar policyHaryana Solar Power Policy, 2016 (notified 14 March 2016; in force until a new policy is notified)
Rooftop metering for businessesNet metering up to 500 kW, within the sanctioned load
Modelled solar outputabout 1,460 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 290 km from Ellenabad in a straight line

Solar services in Ellenabad

Local points for solar projects in Ellenabad

The Government of India's One District One Product (ODOP) list names Cotton Products (Balls, Swabs) and Sheet Fabrication (Pre Fab Structures) as the products of Sirsa district.

Solar output in Ellenabad

A solar plant in Ellenabad is modelled to produce about 1,460 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Supply (above 50 kW), supply at 11 kV energy charge of ₹6.95 per kVAh (HERC tariff order of 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Energy charge only. The fixed charge is ₹290 per kVA of contract demand per month. Supply at 33 kV is ₹6.85 per kVAh and at 66 or 132 kV ₹6.75 per kVAh. Electricity duty, municipal tax and fuel surcharge adjustment (FSA) are extra. The rates are the same for UHBVN and DHBVN and did not change from 2025-26.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.95 per kVAh
100 kW1.5 lakh units1,000 sq m₹10.1 lakh
500 kW7.3 lakh units5,000 sq m₹50.7 lakh
1 MW14.6 lakh units10,000 sq m₹1.01 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Ellenabad

For a rooftop array in Ellenabad the strongest month is May, at about 149 units for each kW installed, and the weakest is December, at about 104. For a ground-mounted array at a 32° tilt the strongest month is March (about 148) and the weakest is July (about 108). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January105134
February113133
March137148
April144142
May149136
June133118
July119108
August115109
September115119
October123141
November106133
December104138

Somaya Solar projects near Ellenabad

These are the Somaya Solar projects closest to Ellenabad, with straight-line distances. They are shown as references and are not in Ellenabad unless the line says so.

  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 330 km from Ellenabad. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 340 km from Ellenabad. Included net-metering coordination with the local electricity distribution company.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 370 km from Ellenabad. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Ellenabad

Which electricity company handles solar connections in Ellenabad?

Dakshin Haryana Bijli Vitran Nigam Limited (DHBVN) supplies electricity in Sirsa district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Ellenabad?

Net metering up to 500 kW, within the sanctioned load. The rule is the same across Haryana.

How much electricity does a solar plant generate in Ellenabad?

About 1,460 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.6 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Ellenabad?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 290 km from Ellenabad in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 330 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Ellenabad

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.