Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Gumla, Jharkhand.

Gumla at a glance for solar projects

District and stateGumla district, Jharkhand
Electricity supplyJharkhand Bijli Vitran Nigam Limited (JBVNL), the state distribution company, holds a licence covering the whole of Jharkhand, including Gumla district.
Electricity regulatorJharkhand State Electricity Regulatory Commission (JSERC)
State renewable energy agencyJharkhand Renewable Energy Development Agency (JREDA)
State solar policyJharkhand State Solar Policy 2022 (notified 5 July 2022, valid for five years unless another policy replaces it)
Rooftop metering for businessesNet or gross metering for rooftop plants of 1 kWp to 2 MWp, up to 100% of sanctioned load
Modelled solar outputabout 1,350 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 940 km from Gumla in a straight line

Solar services in Gumla

Gumla: industrial areas

JIADA, the Jharkhand Industrial Area Development Authority, lists Gumla Industrial Area among its industrial areas in Gumla district.

The Government of India's One District One Product (ODOP) list names Ragi as the product of Gumla district.

Solar output in Gumla

A solar plant in Gumla is modelled to produce about 1,350 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the High Tension Service (HTS), JBVNL, 6.6 kV and above energy charge of ₹6.40 per kVAh (JSERC tariff order for JBVNL dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹400 per kVA per month also applies. Billing demand is the recorded maximum demand or 75% of contract demand, whichever is higher. The rate for HTSS (induction or arc furnaces of 300 kVA and more) is ₹5.80 per kVAh. Time-of-day billing is an option for HTS consumers: 85% of the rate from 10 PM to 6 AM, 100% from 10 AM to 6 PM and 120% from 6 AM to 10 AM and 6 PM to 10 PM. The order calls these ceiling tariffs. Tata Steel, Tata Steel UISL, DVC and SAIL Bokaro have their own tariff schedules, so rates differ in their areas.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.40 per kVAh
100 kW1.4 lakh units1,000 sq m₹8.6 lakh
500 kW6.8 lakh units5,000 sq m₹43.2 lakh
1 MW13.5 lakh units10,000 sq m₹86.4 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Gumla

For a rooftop array in Gumla the strongest month is March, at about 140 units for each kW installed, and the weakest is July, at about 82. For a ground-mounted array at a 29° tilt the strongest month is March (about 146) and the weakest is July (about 75). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January119142
February119134
March140146
April138134
May135124
June10594
July8275
August8379
September9090
October112122
November111128
December113136

Somaya Solar projects near Gumla

These are the Somaya Solar projects closest to Gumla, with straight-line distances. They are shown as references and are not in Gumla unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 430 km from Gumla. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 710 km from Gumla. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 880 km from Gumla. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Gumla

Which electricity company handles solar connections in Gumla?

Jharkhand Bijli Vitran Nigam Limited (JBVNL), the state distribution company, holds a licence covering the whole of Jharkhand, including Gumla district.

Is net metering available for factories and commercial buildings in Gumla?

Net or gross metering for rooftop plants of 1 kWp to 2 MWp, up to 100% of sanctioned load. The rule is the same across Jharkhand.

How much electricity does a solar plant generate in Gumla?

About 1,350 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.5 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Gumla?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 940 km from Gumla in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 430 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Gumla

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image