Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Hosur, Tamil Nadu.

Hosur at a glance for solar projects

District and stateKrishnagiri district, Tamil Nadu
Electricity supplyTamil Nadu Power Distribution Corporation Limited (TNPDCL, formerly TANGEDCO) is the state distribution company and supplies Krishnagiri district.
Electricity regulatorTamil Nadu Electricity Regulatory Commission (TNERC)
State renewable energy agencyTamil Nadu Energy Development Agency (TEDA)
Rooftop metering for businessesNet metering for homes only; commercial and industrial users get net billing (net feed-in) up to the sanctioned load or 999 kW
Modelled solar outputabout 1,410 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1770 km from Hosur in a straight line

Solar services in Hosur

Hosur: industrial areas

SIPCOT, the State Industries Promotion Corporation of Tamil Nadu, lists Hosur Industrial Park, Shoolagiri Industrial Park-(Hosur,Phase-IV)-(Future Mobility Park) and Shoolagiri Industrial Park-(Hosur,Phase-IV)-(GENERAL ENGINEERING) among its industrial areas in Krishnagiri district.

The Government of India's One District One Product (ODOP) list names Mango - Food Processing as the product of Krishnagiri district.

Solar output in Hosur

A solar plant in Hosur is modelled to produce about 1,410 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-I Industries, Factories, IT services energy charge of ₹7.50 per kWh (TNERC suo-motu tariff order No. 6 of 2025, dated 30 June 2025, in force from 1 July 2025). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹608 per kVA per month also applies. It is charged on the recorded kVA demand or 90% of the contract demand, whichever is higher. Energy used from 6 AM to 10 AM and from 6 PM to 10 PM is billed at 25% extra, and energy used from 10 PM to 5 AM gets a 5% reduction. The rates exclude electricity tax and duty. TNPDCL is the only licensee named in the order. The order says its tariffs stay valid until the next order.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.50 per kWh
100 kW1.4 lakh units1,000 sq m₹10.6 lakh
500 kW7.0 lakh units5,000 sq m₹52.9 lakh
1 MW14.1 lakh units10,000 sq m₹1.06 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Hosur

For a rooftop array in Hosur the strongest month is March, at about 146 units for each kW installed, and the weakest is July, at about 97. For a ground-mounted array at a 16° tilt the strongest month is March (about 147) and the weakest is July (about 94). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January133138
February133137
March146147
April133131
May127123
June105102
July9794
August102101
September109109
October112114
November99102
December110115

Somaya Solar projects near Hosur

These are the Somaya Solar projects closest to Hosur, with straight-line distances. They are shown as references and are not in Hosur unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1260 km from Hosur. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1700 km from Hosur. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1800 km from Hosur. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Hosur

Which electricity company handles solar connections in Hosur?

Tamil Nadu Power Distribution Corporation Limited (TNPDCL, formerly TANGEDCO) is the state distribution company and supplies Krishnagiri district.

Is net metering available for factories and commercial buildings in Hosur?

Net metering for homes only; commercial and industrial users get net billing (net feed-in) up to the sanctioned load or 999 kW. The rule is the same across Tamil Nadu.

How much electricity does a solar plant generate in Hosur?

About 1,410 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.1 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Hosur?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1770 km from Hosur in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1260 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Hosur

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.