Somaya Solar Solutions Limited delivers turnkey solar projects in Jalalabad, Punjab: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Jalalabad
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier (PSPCL) for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Jalalabad
In Punjab, commercial and industrial consumers can use net metering for a rooftop plant from 1 kWp up to their sanctioned load or contract demand, with a ceiling of 500 kWp. The regulator set this in the third amendment to its 2021 rooftop regulations, notified on 7 April 2026. Before that, a non-domestic consumer could install only up to 70% of the sanctioned load.
The size limits, charges and other conditions for Punjab are on the page Turnkey Solar EPC in Punjab.
In Jalalabad the application for connection and metering goes to PSPCL.
What to expect from the plant in Jalalabad
A solar plant in Jalalabad is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Supply industrial, General Industry, above 100 kVA and up to 1,000 kVA (11 kV or higher) energy charge of ₹5.90 per kVAh (PSERC tariff order for PSPCL for 2026-27, dated 6 March 2026, in force from 1 April 2026 to 31 March 2027). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Above 1,000 kVA the energy charge is ₹6.00 per kVAh. Fixed charges also apply: ₹210 per kVA per month up to 1,000 kVA and ₹280 above that. Time-of-day rates apply: ₹2.00 per kVAh extra from 6 PM to 10 PM between 16 June and 15 October, and a night rebate from 10 PM to 6 AM of ₹0.50 per kVAh (1 April to 15 June) or ₹1.00 per kVAh (16 October to 31 March). A fuel and power purchase adjustment surcharge is added. The order applies to PSPCL, the distribution licensee for Punjab.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹5.90 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹8.4 lakh |
| 500 kW | 7.1 lakh units | 5,000 sq m | ₹41.9 lakh |
| 1 MW | 14.2 lakh units | 10,000 sq m | ₹83.8 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Reference projects near Jalalabad
These are the Somaya Solar projects closest to Jalalabad, with straight-line distances. They are shown as references and are not in Jalalabad unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 370 km from Jalalabad. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 380 km from Jalalabad. Included net-metering coordination with the local electricity distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 450 km from Jalalabad. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Jalalabad
Which electricity company handles solar connections in Jalalabad?
Punjab State Power Corporation Limited (PSPCL) is the distribution utility for Punjab and supplies Fazilka district.
Is net metering available for factories and commercial buildings in Jalalabad?
Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Punjab.
How much electricity does a solar plant generate in Jalalabad?
About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Jalalabad?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 380 km from Jalalabad in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 370 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Jalalabad
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- PSERC (Grid Interactive Rooftop Solar Photo Voltaic Systems) Regulations, 2021, with the Third Amendment notified on 7 April 2026 (Punjab Government Gazette, 11 April 2026)
- PSERC Tariff Order FY 2026-27 for PSPCL (order dated 06 March 2026), Chapter 1, page 1
- PSERC tariff order for PSPCL for 2026-27, dated 6 March 2026, Annexure II (Schedules of Tariff), Schedule SI.3
- PVGIS, European Commission Joint Research Centre (solar output model)