Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Jhumri Telaiya, Jharkhand.

Jhumri Telaiya at a glance for solar projects

District and stateKoderma district, Jharkhand
Electricity supplyJharkhand Bijli Vitran Nigam Limited (JBVNL), the state distribution company, holds a licence covering the whole of Jharkhand, including Koderma district.
Electricity regulatorJharkhand State Electricity Regulatory Commission (JSERC)
State renewable energy agencyJharkhand Renewable Energy Development Agency (JREDA)
State solar policyJharkhand State Solar Policy 2022 (notified 5 July 2022, valid for five years unless another policy replaces it)
Rooftop metering for businessesNet or gross metering for rooftop plants of 1 kWp to 2 MWp, up to 100% of sanctioned load
Modelled solar outputabout 1,360 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 930 km from Jhumri Telaiya in a straight line

Solar services in Jhumri Telaiya

Jhumri Telaiya: industrial areas

JIADA, the Jharkhand Industrial Area Development Authority, lists Jhumritilaiya Industrial Estate among its industrial areas in Koderma district.

Damodar Valley Corporation (DVC) also operates in this area: Jharkhand's electricity regulator lists DVC as a deemed licensee "at present supplying power at 33 KV and above", so a large plant connected at that voltage may be supplied by DVC rather than JBVNL.

Solar output in Jhumri Telaiya

A solar plant in Jhumri Telaiya is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the High Tension Service (HTS), JBVNL, 6.6 kV and above energy charge of ₹6.40 per kVAh (JSERC tariff order for JBVNL dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹400 per kVA per month also applies. Billing demand is the recorded maximum demand or 75% of contract demand, whichever is higher. The rate for HTSS (induction or arc furnaces of 300 kVA and more) is ₹5.80 per kVAh. Time-of-day billing is an option for HTS consumers: 85% of the rate from 10 PM to 6 AM, 100% from 10 AM to 6 PM and 120% from 6 AM to 10 AM and 6 PM to 10 PM. The order calls these ceiling tariffs. Tata Steel, Tata Steel UISL, DVC and SAIL Bokaro have their own tariff schedules, so rates differ in their areas.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.40 per kVAh
100 kW1.4 lakh units1,000 sq m₹8.7 lakh
500 kW6.8 lakh units5,000 sq m₹43.5 lakh
1 MW13.6 lakh units10,000 sq m₹87.0 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Jhumri Telaiya

For a rooftop array in Jhumri Telaiya the strongest month is March, at about 142 units for each kW installed, and the weakest is July, at about 88. For a ground-mounted array at a 29° tilt the strongest month is March (about 149) and the weakest is July (about 80). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January117142
February119135
March142149
April141137
May136123
June10897
July8880
August8984
September9293
October110120
November109129
December111137

Somaya Solar projects near Jhumri Telaiya

These are the Somaya Solar projects closest to Jhumri Telaiya, with straight-line distances. They are shown as references and are not in Jhumri Telaiya unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 530 km from Jhumri Telaiya. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 680 km from Jhumri Telaiya. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 840 km from Jhumri Telaiya. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Jhumri Telaiya

Which electricity company handles solar connections in Jhumri Telaiya?

Jharkhand Bijli Vitran Nigam Limited (JBVNL), the state distribution company, holds a licence covering the whole of Jharkhand, including Koderma district.

Is net metering available for factories and commercial buildings in Jhumri Telaiya?

Net or gross metering for rooftop plants of 1 kWp to 2 MWp, up to 100% of sanctioned load. The rule is the same across Jharkhand.

How much electricity does a solar plant generate in Jhumri Telaiya?

About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Jhumri Telaiya?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 930 km from Jhumri Telaiya in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 530 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Jhumri Telaiya

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.