Somaya Solar Solutions Limited is an EPC contractor for PM-KUSUM solar plants. This page sets out how the scheme works for land and pumps in Kadapa, Andhra Pradesh and what we do on such a project.
What PM-KUSUM covers
PM-KUSUM is a central government scheme of the Ministry of New and Renewable Energy, run in each state by state implementing agencies. Capacity is allotted to states on demand. The Ministry told the Lok Sabha on 29 July 2026 that the scheme's timeline is extended to 31 March 2027 for all components. The three parts of the scheme are set out on our PM-KUSUM page.
Who runs PM-KUSUM in Andhra Pradesh
In the Lok Sabha answer of 29 July 2026, the Ministry of New and Renewable Energy shows no figure for Andhra Pradesh under PM-KUSUM Component A, B or C up to 30 June 2026. Which agency runs each component in the state was not confirmed from an official source.
The targets, tariffs and application details for Andhra Pradesh are on the page PM-KUSUM in Andhra Pradesh.
For land or pumps in Kadapa, the electricity supplier is the one to check first: Southern Power Distribution Company of Andhra Pradesh Limited (APSPDCL) supplies electricity in YSR Kadapa district, one of the districts it lists as its area.
What a PM-KUSUM plant produces in Kadapa
A solar plant in Kadapa is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (17°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 500 kW | 6.8 lakh units | 2 to 2.5 acres |
| 1 MW | 13.7 lakh units | 4 to 5 acres |
| 2 MW | 27.4 lakh units | 8 to 10 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What Somaya Solar does on a PM-KUSUM plant
Somaya Solar works as the EPC contractor for the farmer, developer or group that holds the allocation. It does not allot capacity or decide subsidy.
- Site check of the land and its distance from the substation
- Plant design and equipment supply
- Installation, testing and commissioning
- The line to the substation and coordination with the electricity supplier
- Support with the documents the implementing agency asks for
More detail: PM-KUSUM across India.
PM-KUSUM plants built by Somaya Solar
These are the Somaya Solar projects closest to Kadapa, with straight-line distances. They are shown as references and are not in Kadapa unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1050 km from Kadapa. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1600 km from Kadapa. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Kadapa
Which electricity company handles solar connections in Kadapa?
Southern Power Distribution Company of Andhra Pradesh Limited (APSPDCL) supplies electricity in YSR Kadapa district, one of the districts it lists as its area.
How much electricity does a solar plant generate in Kadapa?
About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.
Who do I apply to for PM-KUSUM in Andhra Pradesh?
In the Lok Sabha answer of 29 July 2026, the Ministry of New and Renewable Energy shows no figure for Andhra Pradesh under PM-KUSUM Component A, B or C up to 30 June 2026. Which agency runs each component in the state was not confirmed from an official source.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Kadapa?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1580 km from Kadapa in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1050 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Kadapa
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.