Somaya Solar Solutions Limited delivers turnkey solar projects in Karur, Tamil Nadu: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Karur
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier (TNPDCL) for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Karur
In Tamil Nadu, net metering is open only to domestic consumers. Commercial and industrial consumers, at any voltage, can install rooftop solar under net billing (also called net feed-in) up to their sanctioned load or contract demand, or 999 kW, whichever is lower. The rules are in the TNERC Grid Interactive Solar PV Energy Generating Systems Regulations, 2021, which apply to loads of less than 1 MW.
The size limits, charges and other conditions for Tamil Nadu are on the page Turnkey Solar EPC in Tamil Nadu.
In Karur the application for connection and metering goes to TNPDCL.
What to expect from the plant in Karur
A solar plant in Karur is modelled to produce about 1,390 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-I Industries, Factories, IT services energy charge of ₹7.50 per kWh (TNERC suo-motu tariff order No. 6 of 2025, dated 30 June 2025, in force from 1 July 2025). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹608 per kVA per month also applies. It is charged on the recorded kVA demand or 90% of the contract demand, whichever is higher. Energy used from 6 AM to 10 AM and from 6 PM to 10 PM is billed at 25% extra, and energy used from 10 PM to 5 AM gets a 5% reduction. The rates exclude electricity tax and duty. TNPDCL is the only licensee named in the order. The order says its tariffs stay valid until the next order.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.50 per kWh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹10.4 lakh |
| 500 kW | 7.0 lakh units | 5,000 sq m | ₹52.1 lakh |
| 1 MW | 13.9 lakh units | 10,000 sq m | ₹1.04 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Reference projects near Karur
These are the Somaya Solar projects closest to Karur, with straight-line distances. They are shown as references and are not in Karur unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1450 km from Karur. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1890 km from Karur. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 2000 km from Karur. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Karur
Which electricity company handles solar connections in Karur?
Tamil Nadu Power Distribution Corporation Limited (TNPDCL, formerly TANGEDCO) is the state distribution company and supplies Karur district.
Is net metering available for factories and commercial buildings in Karur?
Net metering for homes only; commercial and industrial users get net billing (net feed-in) up to the sanctioned load or 999 kW. The rule is the same across Tamil Nadu.
How much electricity does a solar plant generate in Karur?
About 1,390 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.9 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Karur?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1970 km from Karur in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1450 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Karur
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- TNERC (Grid Interactive Solar PV Energy Generating Systems) Regulations, 2021, notified 7 October 2021 (Tamil Nadu Government Gazette, 20 October 2021); TANGEDCO salient features of TNERC generic tariff order No. 8 of 2021 dated 22 October 2021; TNPDCL rooftop solar page 'Policies Adopted'
- TNERC suo-motu tariff order No. 6 of 2025, dated 30 June 2025 (TNPDCL, FY 2025-26, effective 1 July 2025), paragraph 3.1.1 and tariff table
- TNPDCL profile page