Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Keonjhargarh, Odisha.
Keonjhargarh at a glance for solar projects
| District and state | Keonjhar district, Odisha |
|---|---|
| Electricity supply | TP Northern Odisha Distribution Limited (TPNODL) supplies electricity in Keonjhar district, one of the districts it lists as its area. |
| Electricity regulator | Odisha Electricity Regulatory Commission (OERC) |
| State renewable energy agency | Odisha Renewable Energy Development Agency (OREDA Limited) (OREDA) |
| State solar policy | Odisha Renewable Energy Policy, 2022 (in force until 31 March 2030 unless replaced earlier) |
| Rooftop metering for businesses | Net metering up to 500 kW or the sanctioned load, whichever is lower |
| Modelled solar output | about 1,300 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1130 km from Keonjhargarh in a straight line |
Solar services in Keonjhargarh
- Solar EPC Company in Keonjhargarh
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Keonjhargarh
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Keonjhargarh
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Keonjhargarh
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Keonjhargarh
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Keonjhargarh
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Keonjhargarh
The Government of India's One District One Product (ODOP) list names Terracotta as the product of Keonjhar district.
Solar output in Keonjhargarh
A solar plant in Keonjhargarh is modelled to produce about 1,300 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industry, HT, load factor 60% or less energy charge of ₹5.85 per kVAh (OERC common tariff order for 2026-27, dated 24 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The energy charge is ₹4.75 per kVAh when the monthly load factor is above 60%. A demand charge of ₹250 per kVA per month and a customer service charge of ₹250 per month also apply. Time-of-day tariff applies from 1 July 2026 to consumers with smart or AMR meters and contract demand above 10 kW: 10% less in solar hours (8 AM to 4 PM) and 1.1 times in peak hours (6 PM to midnight). The rates exclude electricity duty and other levies. The same rates apply in all four licensee areas.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹5.85 per kVAh |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹7.6 lakh |
| 500 kW | 6.5 lakh units | 5,000 sq m | ₹38.0 lakh |
| 1 MW | 13.0 lakh units | 10,000 sq m | ₹76.0 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Keonjhargarh
For a rooftop array in Keonjhargarh the strongest month is March, at about 135 units for each kW installed, and the weakest is July, at about 79. For a ground-mounted array at a 27° tilt the strongest month is March (about 139) and the weakest is July (about 74). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 118 | 138 |
| February | 116 | 128 |
| March | 135 | 139 |
| April | 134 | 129 |
| May | 130 | 120 |
| June | 99 | 90 |
| July | 79 | 74 |
| August | 80 | 76 |
| September | 84 | 84 |
| October | 105 | 112 |
| November | 107 | 122 |
| December | 110 | 129 |
Somaya Solar projects near Keonjhargarh
These are the Somaya Solar projects closest to Keonjhargarh, with straight-line distances. They are shown as references and are not in Keonjhargarh unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 590 km from Keonjhargarh. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 900 km from Keonjhargarh. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1070 km from Keonjhargarh. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Keonjhargarh
Which electricity company handles solar connections in Keonjhargarh?
TP Northern Odisha Distribution Limited (TPNODL) supplies electricity in Keonjhar district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Keonjhargarh?
Net metering up to 500 kW or the sanctioned load, whichever is lower. The rule is the same across Odisha.
How much electricity does a solar plant generate in Keonjhargarh?
About 1,300 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.0 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Keonjhargarh?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1130 km from Keonjhargarh in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 590 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Keonjhargarh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- OERC common tariff order for TPNODL, TPWODL, TPCODL and TPSODL for 2026-27, 24 March 2026, Table 1 licensed areas (txt-jhod/oerc-discom-order-2627.txt)
- OERC order on Net Metering / Bi-directional Metering of 19 August 2016, as amended up to 17 January 2018, by the order of 5 May 2022 and by the order of 27 November 2025
- OERC retail supply tariff notification for 2026-27, dated 24 March 2026 (schedule, item 23 and note on slab rate of energy charges)
- OREDA Limited website, About OREDA Limited
- Odisha Electricity Regulatory Commission
- Odisha Housing & Urban Development Department, District Wise ULBs and Population (list of 115 ULBs; saved as html-jhod/odisha-ulb-district.html). Row format: district | municipality or NAC
- Odisha Renewable Energy Policy, 2022 (Energy Department resolution No. 11757 of 30 November 2022, Odisha Gazette Extraordinary No. 3354)
- PVGIS, European Commission Joint Research Centre (solar output model)