Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Kochi, Kerala.
Kochi at a glance for solar projects
| District and state | Ernakulam district, Kerala |
|---|---|
| Electricity supply | KSEB Ltd, the state electricity board company, supplies Ernakulam district outside the small areas held by special licensees such as industrial parks. |
| Electricity regulator | Kerala State Electricity Regulatory Commission (KSERC) |
| State renewable energy agency | Agency for New and Renewable Energy Research and Technology (ANERT) |
| State solar policy | Kerala Solar Energy Policy, 2013 (G.O.(P) No. 49/2013/PD of 25 November 2013; stays in force until another policy replaces it) |
| Rooftop metering for businesses | Net metering up to 500 kW for industrial consumers; net billing up to 1 MW (3 MW with storage) |
| Modelled solar output | about 1,240 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 2080 km from Kochi in a straight line |
Solar services in Kochi
- Solar EPC Company in Kochi
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Kochi
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Kochi
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Kochi
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Kochi
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Kochi
One contract from survey to a working plant, with approvals and handover included.
Kochi: industrial areas
KINFRA, the Kerala Industrial Infrastructure Development Corporation, lists KINFRA Petrochemical Park, Kochi among its industrial areas in Ernakulam district.
The Government of India's One District One Product (ODOP) list names Oleo Raisins as the product of Ernakulam district.
Solar output in Kochi
A solar plant in Kochi is modelled to produce about 1,240 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-I(A) Industry (high tension, 11 kV to 33 kV) energy charge of ₹6.25 per unit (KSERC order of 5 December 2024 in OP 18/2023: schedule of tariff for 5 December 2024 to 31 March 2027; the rate shown applies from 1 April 2025). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The energy charge was ₹6.20 per unit from 5 December 2024 to 31 March 2025. A demand charge also applies each month: ₹420 per kVA of billing demand from 1 April 2025. Billing demand is the recorded maximum demand or 75% of the contract demand, whichever is higher. HT consumers are billed on time of day: 100% of the rate from 6:00 to 18:00, 150% from 18:00 to 22:00 and 75% from 22:00 to 6:00. The schedule applies to KSEB Ltd and the other licensees, and the rates exclude electricity duty and surcharge.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.25 per unit |
|---|---|---|---|
| 100 kW | 1.2 lakh units | 1,000 sq m | ₹7.8 lakh |
| 500 kW | 6.2 lakh units | 5,000 sq m | ₹38.8 lakh |
| 1 MW | 12.4 lakh units | 10,000 sq m | ₹77.5 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Kochi
For a rooftop array in Kochi the strongest month is January, at about 133 units for each kW installed, and the weakest is June, at about 74. For a ground-mounted array at a 16° tilt the strongest month is January (about 138) and the weakest is June (about 71). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 133 | 138 |
| February | 126 | 129 |
| March | 133 | 133 |
| April | 113 | 111 |
| May | 94 | 91 |
| June | 74 | 71 |
| July | 78 | 75 |
| August | 85 | 83 |
| September | 90 | 89 |
| October | 98 | 99 |
| November | 97 | 101 |
| December | 116 | 121 |
Somaya Solar projects near Kochi
These are the Somaya Solar projects closest to Kochi, with straight-line distances. They are shown as references and are not in Kochi unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1610 km from Kochi. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 2030 km from Kochi. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 2120 km from Kochi. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Kochi
Which electricity company handles solar connections in Kochi?
KSEB Ltd, the state electricity board company, supplies Ernakulam district outside the small areas held by special licensees such as industrial parks.
Is net metering available for factories and commercial buildings in Kochi?
Net metering up to 500 kW for industrial consumers; net billing up to 1 MW (3 MW with storage). The rule is the same across Kerala.
How much electricity does a solar plant generate in Kochi?
About 1,240 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.4 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Kochi?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 2080 km from Kochi in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1610 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Kochi
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- ANERT website, Overview page (the name is in Malayalam script there); Kerala Solar Energy Policy 2013 names ANERT as the nodal agency for non-conventional energy
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- KINFRA (Kerala Industrial Infrastructure Development Corporation), Parks
- KSERC (Renewable Energy and Related Matters) Regulations, 2025, notified 5 November 2025
- KSERC (Renewable Energy and Related Matters) Regulations, 2025, notified 5 November 2025 (Gazette 6 November 2025)
- KSERC order of 21 May 2026 in OP 63/2025 (KSEB Ltd true-up), para 5.1
- KSERC schedule of tariff and terms and conditions for retail supply, 5 December 2024 to 31 March 2027 (order of 5 December 2024 in OP 18/2023), Part B
- Kerala Local Self Government Department, Urban Affairs Department page (list of corporations and municipalities with district)
- Kerala Solar Energy Policy 2013 (G.O.(P) No. 49/2013/PD, 25 November 2013), as published by ANERT
- PVGIS, European Commission Joint Research Centre (solar output model)