Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Kulgam, Jammu and Kashmir.
Kulgam at a glance for solar projects
| District and state | Kulgam district, Jammu and Kashmir |
|---|---|
| Electricity supply | Kashmir Power Distribution Corporation Limited (KPDCL) supplies electricity in Kulgam district, one of the districts it lists as its area. |
| Electricity regulator | Joint Electricity Regulatory Commission for the UT of Jammu & Kashmir and the UT of Ladakh (JERC) |
| State renewable energy agency | Jammu and Kashmir Energy Development Agency (JAKEDA) |
| Rooftop metering for businesses | Net metering up to 500 kW; net billing above 500 kW up to 1 MW |
| Modelled solar output | about 1,460 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 600 km from Kulgam in a straight line |
Solar services in Kulgam
- Solar EPC Company in Kulgam
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Kulgam
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Kulgam
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Kulgam
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Kulgam
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Kulgam
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Kulgam
The Government of India's One District One Product (ODOP) list names Garlic as the product of Kulgam district.
Solar output in Kulgam
A solar plant in Kulgam is modelled to produce about 1,460 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial Supply (Schedule 6), 11 kV, sanctioned load above 100 kW and up to 1 MVA energy charge of ₹4.50 per kVAh (JERC tariff order No. 06 of 2026 for JPDCL and KPDCL, dated 20 August 2026, applicable to energy used from 1 September 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. One schedule covers both JPDCL and KPDCL. A demand charge of ₹184 per kVA per month also applies, on billing demand. The energy charge is 10 paise lower at 33 kV and 20 paise lower at 66 kV and above. Time-of-day tariff applies: a 20% surcharge on energy charges from 6 am to 9 am and from 5 pm to 10 pm, and a 20% rebate from 9 am to 5 pm. These are the subsidised rates that the licensees must bill; the order counts ₹2,420.78 crore of support from the UT government. HT power-intensive industries (Schedule 7) pay ₹5.30 per kVAh at 11 kV and ₹5.25 at 33 kV, with a demand charge of ₹236 per kVA per month.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹4.50 per kVAh |
|---|---|---|---|
| 100 kW | 1.5 lakh units | 1,000 sq m | ₹6.6 lakh |
| 500 kW | 7.3 lakh units | 5,000 sq m | ₹32.9 lakh |
| 1 MW | 14.6 lakh units | 10,000 sq m | ₹65.7 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Kulgam
For a rooftop array in Kulgam the strongest month is May, at about 148 units for each kW installed, and the weakest is December, at about 100. For a ground-mounted array at a 36° tilt the strongest month is March (about 150) and the weakest is July (about 109). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 103 | 136 |
| February | 108 | 129 |
| March | 138 | 150 |
| April | 140 | 141 |
| May | 148 | 138 |
| June | 141 | 126 |
| July | 119 | 109 |
| August | 118 | 114 |
| September | 124 | 132 |
| October | 125 | 148 |
| November | 101 | 132 |
| December | 100 | 139 |
Somaya Solar projects near Kulgam
These are the Somaya Solar projects closest to Kulgam, with straight-line distances. They are shown as references and are not in Kulgam unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 500 km from Kulgam. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 510 km from Kulgam. Included net-metering coordination with the local electricity distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 620 km from Kulgam. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Kulgam
Which electricity company handles solar connections in Kulgam?
Kashmir Power Distribution Corporation Limited (KPDCL) supplies electricity in Kulgam district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Kulgam?
Net metering up to 500 kW; net billing above 500 kW up to 1 MW. The rule is the same across Jammu and Kashmir.
How much electricity does a solar plant generate in Kulgam?
About 1,460 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.6 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Kulgam?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 600 km from Kulgam in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 500 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Kulgam
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- J&K Official Gazette, S.O. 109 of 20 March 2020 (First Transfer Scheme), definitions and distribution undertakings
- JAKEDA website, About Department (JAKEDA is the State Nodal Agency, under the Department of Science and Technology)
- JERC (Grid Interactive Renewable Energy system and its related matters) Regulations, 2023, notified 29 May 2023 (Gazette of 12 June 2023), and First Amendment Regulations, 2024, notified 28 June 2024 (Gazette of 11 July 2024)
- JERC order No. 06 of 2026 dated 20 August 2026 (JPDCL and KPDCL), cover page and para 1
- JERC tariff order No. 06 of 2026 for JPDCL and KPDCL, dated 20 August 2026 (Table 10-6, Schedule 6; Table 0-3)
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- PVGIS, European Commission Joint Research Centre (solar output model)