Somaya Solar Solutions Limited builds ground-mounted solar power plants in Libaspur, Delhi for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Libaspur
A solar plant in Libaspur is modelled to produce about 1,510 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (32°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 1 MW | 15.1 lakh units | 4 to 5 acres |
| 2 MW | 30.2 lakh units | 8 to 10 acres |
| 5 MW | 75.5 lakh units | 20 to 25 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Delhi
The Delhi Solar Energy Policy, 2023 is Delhi's current solar policy. The Delhi government notified it on 14 March 2024 and amended it on 10 July 2025 and 17 September 2026. The second amendment keeps the policy valid until 31 March 2030 unless another policy replaces it. It also limits the generation-based incentive for new systems to commercial and industrial consumers. The policy covers solar systems of 1 kWp or more.
- Target: 4,500 MW of installed solar capacity by 2026-27. This is 750 MW of rooftop solar inside Delhi and about 3,750 MW of utility-scale solar from outside Delhi.
- The Energy Efficiency and Renewable Energy Management (EE&REM) Centre of the Department of Power is the state nodal agency for the policy.
- Commercial and industrial consumers get a generation-based incentive of ₹1 per kWh for five years from commissioning. It is offered for the first 200 MW installed, so check with the distribution company that it is still open.
- Exported units left after net metering roll over to later billing cycles for up to 12 months, until the end of the financial year. Solar plants up to 500 kVA are exempt from inspection by the Electrical Inspector.
- Group net metering, virtual net metering and peer-to-peer trading follow the regulations and guidelines of DERC.
Under DERC's Green Energy Open Access Regulations, 2024, as amended in 2026, a consumer with a contract demand or sanctioned load of 100 kW or more can take renewable power through open access. The 100 kW can be one connection or several connections in the area of the same distribution licensee.
- The first amendment, dated 17 June 2026 and published in the Delhi Gazette on 18 August 2026, removed the earlier condition that the consumer be connected at 11 kV or above.
- A consumer with a captive generating plant has no load limit. Captive use pays no cross-subsidy surcharge and no additional surcharge.
- Banking is allowed at least monthly. The banking charge is 8% of the banked energy, taken in units. Banked energy cannot be carried to the next billing cycle; unused units lapse.
- The additional surcharge does not apply up to the contract demand the consumer keeps with the distribution licensee. Where it applies, it reduces each year and ends within four years of the grant of open access.
- The tariff order in force (FY 2021-22) sets wheeling charges at 11 kV of ₹1.061 per unit for BRPL, ₹1.240 for BYPL and ₹1.017 for TPDDL. It gives no figure for the cross-subsidy surcharge or the additional surcharge, so ask the distribution licensee for the current rates.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Ground-mounted projects by Somaya Solar near Libaspur
These are the Somaya Solar projects closest to Libaspur, with straight-line distances. They are shown as references and are not in Libaspur unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 130 km from Libaspur. In progress. Site access was difficult and was handled with local support.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 640 km from Libaspur. Completed, including the transmission line work coordinated with the local distribution company.
Questions about solar projects in Libaspur
Which electricity company handles solar connections in Libaspur?
Tata Power Delhi Distribution Limited (TPDDL) supplies Libaspur, which the cited source places in its supply area.
How much electricity does a solar plant generate in Libaspur?
About 1,510 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.1 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Libaspur?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 30 km from Libaspur in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 130 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Libaspur
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 (Delhi Gazette, 12 November 2024) with the First Amendment Regulations, 2026 (Delhi Gazette, 18 August 2026)
- Delhi Solar Energy Policy, 2023 (Delhi Gazette, 14 March 2024) with the First Amendment (10 July 2025) and the Second Amendment (Delhi Gazette, 17 September 2026)
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- TPDDL: source naming Libaspur within its supply area