Somaya Solar Solutions Limited delivers turnkey solar projects in Mangaluru, Karnataka: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Mangaluru
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier (MESCOM) for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Mangaluru
In Karnataka, net metering is open to every consumer category, including commercial and industrial. The plant may be up to the sanctioned load or contract demand, or 1,000 kW, whichever is lower. The Distributed Solar PV (DSPV) Plants Regulations, 2026 set this. They were notified on 19 August 2026, published in the gazette on 24 August 2026, and replaced the 2016 rooftop regulations.
The size limits, charges and other conditions for Karnataka are on the page Turnkey Solar EPC in Karnataka.
In Mangaluru the application for connection and metering goes to MESCOM.
What to expect from the plant in Mangaluru
A solar plant in Mangaluru is modelled to produce about 1,280 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-2(a) Industrial, rate the Tariff Order 2025 fixes for FY2026-27 energy charge of ₹6.60 per kWh (KERC Combined Tariff Order 2025 for the ESCOMs, dated 27 March 2025 (FY2025-26 to FY2027-28), and KERC review order of 3 March 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The Tariff Order 2025 fixes the HT-2(a) energy charge for FY2026-27 at 660 paise per kWh, with a demand charge of ₹350 per kVA per month. KERC's review order of 3 March 2026 re-fixed HT-2(a) for FY2025-26 at ₹6.70 per unit and ₹365 per kVA. It does not say what applies for FY2026-27; the table uses the ₹6.60 the Tariff Order 2025 fixes for that year. The same HT-2(a) schedule applies to all five distribution companies. A time-of-day tariff applies (plus 100 paise at 06:00-09:00 and 18:00-22:00 and minus 100 paise at 22:00-06:00, December to June). BESCOM consumers also pay an FY25 true-up charge per unit from May 2026 to April 2027. Confirm the rate with the distribution company.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.60 per kWh |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹8.4 lakh |
| 500 kW | 6.4 lakh units | 5,000 sq m | ₹42.2 lakh |
| 1 MW | 12.8 lakh units | 10,000 sq m | ₹84.5 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Reference projects near Mangaluru
These are the Somaya Solar projects closest to Mangaluru, with straight-line distances. They are shown as references and are not in Mangaluru unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1350 km from Mangaluru. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1740 km from Mangaluru. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1820 km from Mangaluru. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Mangaluru
Which electricity company handles solar connections in Mangaluru?
Mangalore Electricity Supply Company Limited (MESCOM) supplies electricity in Dakshina Kannada district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Mangaluru?
Net metering up to the sanctioned load or 1,000 kW, whichever is lower. The rule is the same across Karnataka.
How much electricity does a solar plant generate in Mangaluru?
About 1,280 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.8 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Mangaluru?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1770 km from Mangaluru in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1350 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Mangaluru
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- KERC (Grid Interactive Distributed Solar Photovoltaic (DSPV) Plants) Regulations, 2026 (notification of 19 August 2026) and KERC generic tariff order of 25 August 2026
- KERC Combined Tariff Order 2025 for the ESCOMs, dated 27 March 2025
- MESCOM website, About Us
- PVGIS, European Commission Joint Research Centre (solar output model)