Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions and landowners in Mundka, Delhi.
Mundka at a glance for solar projects
| District and state | Outer North district, Delhi |
|---|---|
| Electricity supply | BSES Rajdhani Power Limited (BRPL) supplies Mundka, which the cited source places in its supply area. |
| Electricity regulator | Delhi Electricity Regulatory Commission (DERC) |
| State renewable energy agency | Energy Efficiency and Renewable Energy Management Centre, Department of Power, Government of NCT of Delhi (EE&REM Centre) |
| State solar policy | Delhi Solar Energy Policy, 2023 (notified 14 March 2024; valid until 31 March 2030 unless replaced earlier) |
| Rooftop metering for businesses | Net metering from 1 kWp, with plant size linked to the sanctioned load |
| Modelled solar output | about 1,420 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 40 km from Mundka in a straight line |
Solar services in Mundka
- Solar EPC Company in Mundka
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Mundka
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Mundka
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Mundka
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Mundka
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Mundka
One contract from survey to a working plant, with approvals and handover included.
Solar output in Mundka
A solar plant in Mundka is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial energy charge of ₹7.75 per kVAh (DERC Tariff Order for FY 2021-22, dated 30 September 2021, in force from 1 October 2021 and still the prevailing order in November 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The tariff schedule has one Industrial category, with the same rate in the BRPL, BYPL, TPDDL and NDMC areas. A fixed charge of ₹250 per kVA per month also applies. Supply at 11 kV gets a 3% rebate on energy charges. Time-of-day rates apply to consumers other than domestic with a sanctioned load of 10 kW/11 kVA or more. BRPL, BYPL and TPDDL bills also carry surcharges of 8% and 7% on fixed and energy charges, and a fuel and power purchase adjustment surcharge (FPPAS).
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.75 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹11.0 lakh |
| 500 kW | 7.1 lakh units | 5,000 sq m | ₹55.0 lakh |
| 1 MW | 14.2 lakh units | 10,000 sq m | ₹1.10 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Mundka
For a rooftop array in Mundka the strongest month is May, at about 147 units for each kW installed, and the weakest is August, at about 101. For a ground-mounted array at a 32° tilt the strongest month is March (about 148) and the weakest is July (about 92). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 107 | 136 |
| February | 112 | 132 |
| March | 138 | 148 |
| April | 144 | 141 |
| May | 147 | 133 |
| June | 127 | 112 |
| July | 102 | 92 |
| August | 101 | 96 |
| September | 107 | 110 |
| October | 122 | 140 |
| November | 107 | 134 |
| December | 105 | 138 |
Somaya Solar projects near Mundka
These are the Somaya Solar projects closest to Mundka, with straight-line distances. They are shown as references and are not in Mundka unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 140 km from Mundka. In progress. Site access was difficult and was handled with local support.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 170 km from Mundka. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 180 km from Mundka. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Mundka
Which electricity company handles solar connections in Mundka?
BSES Rajdhani Power Limited (BRPL) supplies Mundka, which the cited source places in its supply area.
Is net metering available for factories and commercial buildings in Mundka?
In Delhi, rooftop solar connects under net metering. DERC's Net Metering for Renewable Energy Regulations, 2014 apply to consumers who buy electricity from a distribution licensee, and the solar policy confirms that this includes commercial and industrial consumers. The plant must be at least 1 kWp. Its size is subject to the sanctioned load, the capacity of the service line and the feasibility of connecting to the grid.
How much electricity does a solar plant generate in Mundka?
About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Mundka?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 40 km from Mundka in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 140 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Mundka
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- BRPL: source naming Mundka within its supply area
- DERC (Net Metering for Renewable Energy) Regulations, 2014, with the First Amendment Regulations of 26 July 2024, the Net Metering Guidelines as amended to 16 July 2026, the Group and Virtual Net Metering Guidelines, 2019 as amended to 20 January 2026, and the Peer to Peer Energy Transaction Guidelines of 24 June 2024
- DERC Tariff Order for FY 2021-22 (BSES Rajdhani Power Limited), dated 30 September 2021, Tariff Schedule; DERC order of 10 November 2026 on the fuel and power purchase adjustment surcharge
- Delhi Electricity Regulatory Commission
- Delhi Gazette Extraordinary Part IV, Revenue Dept notification F.223/SDM-II(HQ)/Land/2025/285 of 25 Dec 2025 (Tables I and II), revenue.delhi.gov.in
- Delhi Solar Energy Policy, 2023 (Delhi Gazette, 14 March 2024) with the First Amendment (10 July 2025) and the Second Amendment (Delhi Gazette, 17 September 2026)
- Delhi Solar Energy Policy, 2023 (Department of Power, Government of NCT of Delhi; Delhi Gazette, 14 March 2024)
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)