Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Nahan, Himachal Pradesh.

Nahan at a glance for solar projects

District and stateSirmaur district, Himachal Pradesh
Electricity supplyHimachal Pradesh State Electricity Board Limited (HPSEBL) is the distribution utility for Himachal Pradesh and supplies Sirmaur district.
Electricity regulatorHimachal Pradesh Electricity Regulatory Commission (HPERC)
State renewable energy agencyHimachal Pradesh Energy Development Agency (HIMURJA)
State solar policySwaran Jayanti Energy Policy, 2021 (notified on 20 January 2022, as amended)
Rooftop metering for businessesNet metering up to 50 kWp; net billing above 50 kWp up to 1 MWp
Modelled solar outputabout 1,360 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 210 km from Nahan in a straight line

Solar services in Nahan

Local points for solar projects in Nahan

The Government of India's One District One Product (ODOP) list names Packaging (Corrugated Boxes) as the product of Sirmaur district.

Solar output in Nahan

A solar plant in Nahan is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial Power Supply (LIPS), HT-1, contract demand above 100 kVA and up to 1 MVA energy charge of ₹5.85 per kVAh (HPERC tariff order for HPSEBL for 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹5.60 per kVAh for HT-2 (contract demand above 1 MVA), ₹5.55 at 66 kV, ₹5.50 at 132 kV and ₹5.45 at 220 kV and above. A demand charge also applies each month: ₹250 per kVA for HT-1, ₹400 per kVA for HT-2 and ₹425 per kVA for EHT. It is charged on the recorded maximum demand or 85% of the contract demand, whichever is higher. Energy used in peak hours (6:30 PM to 10 PM) is charged at ₹6.95 per kVAh for HT and ₹6.75 for EHT. The rates exclude electricity duty and taxes. HPSEBL is the only licensee, so the schedule applies across the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹5.85 per kVAh
100 kW1.4 lakh units1,000 sq m₹8.0 lakh
500 kW6.8 lakh units5,000 sq m₹39.8 lakh
1 MW13.6 lakh units10,000 sq m₹79.6 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Nahan

For a rooftop array in Nahan the strongest month is May, at about 144 units for each kW installed, and the weakest is August, at about 91. For a ground-mounted array at a 34° tilt the strongest month is March (about 144) and the weakest is July (about 83). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January99131
February104125
March133144
April140137
May144130
June127111
July9383
August9187
September103107
October121140
November104133
December101138

Somaya Solar projects near Nahan

These are the Somaya Solar projects closest to Nahan, with straight-line distances. They are shown as references and are not in Nahan unless the line says so.

  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 100 km from Nahan. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 110 km from Nahan. Included net-metering coordination with the local electricity distribution company.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 220 km from Nahan. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Nahan

Which electricity company handles solar connections in Nahan?

Himachal Pradesh State Electricity Board Limited (HPSEBL) is the distribution utility for Himachal Pradesh and supplies Sirmaur district.

Is net metering available for factories and commercial buildings in Nahan?

Net metering up to 50 kWp; net billing above 50 kWp up to 1 MWp. The rule is the same across Himachal Pradesh.

How much electricity does a solar plant generate in Nahan?

About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Nahan?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 210 km from Nahan in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 100 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Nahan

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.