Nangal at a glance for solar projects
| District and state | Rupnagar district, Punjab |
|---|---|
| Electricity supply | Punjab State Power Corporation Limited (PSPCL) is the distribution utility for Punjab and supplies Rupnagar district. |
| Electricity regulator | Punjab State Electricity Regulatory Commission (PSERC) |
| State renewable energy agency | Punjab Energy Development Agency (PEDA) |
| State solar policy | New and Renewable Sources of Energy (NRSE) Policy, 2012 (in force until the government notifies a new policy) |
| Rooftop metering for businesses | Net metering up to 500 kWp, within the sanctioned load |
| Modelled solar output | about 1,360 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 320 km from Nangal in a straight line |
Solar services in Nangal
- Solar EPC Company in Nangal
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Nangal
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Nangal
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Nangal
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Nangal
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Nangal
One contract from survey to a working plant, with approvals and handover included.
Solar output in Nangal
A solar plant in Nangal is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Supply industrial, General Industry, above 100 kVA and up to 1,000 kVA (11 kV or higher) energy charge of ₹5.90 per kVAh (PSERC tariff order for PSPCL for 2026-27, dated 6 March 2026, in force from 1 April 2026 to 31 March 2027). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Above 1,000 kVA the energy charge is ₹6.00 per kVAh. Fixed charges also apply: ₹210 per kVA per month up to 1,000 kVA and ₹280 above that. Time-of-day rates apply: ₹2.00 per kVAh extra from 6 PM to 10 PM between 16 June and 15 October, and a night rebate from 10 PM to 6 AM of ₹0.50 per kVAh (1 April to 15 June) or ₹1.00 per kVAh (16 October to 31 March). A fuel and power purchase adjustment surcharge is added. The order applies to PSPCL, the distribution licensee for Punjab.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹5.90 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹8.0 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹40.1 lakh |
| 1 MW | 13.6 lakh units | 10,000 sq m | ₹80.2 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Nangal
For a rooftop array in Nangal the strongest month is May, at about 143 units for each kW installed, and the weakest is January, at about 93. For a ground-mounted array at a 34° tilt the strongest month is March (about 140) and the weakest is July (about 93). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 93 | 122 |
| February | 101 | 122 |
| March | 129 | 140 |
| April | 137 | 135 |
| May | 143 | 131 |
| June | 130 | 114 |
| July | 104 | 93 |
| August | 100 | 96 |
| September | 108 | 112 |
| October | 119 | 139 |
| November | 101 | 130 |
| December | 97 | 132 |
Somaya Solar projects near Nangal
These are the Somaya Solar projects closest to Nangal, with straight-line distances. They are shown as references and are not in Nangal unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 230 km from Nangal. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 230 km from Nangal. Included net-metering coordination with the local electricity distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 340 km from Nangal. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Nangal
Which electricity company handles solar connections in Nangal?
Punjab State Power Corporation Limited (PSPCL) is the distribution utility for Punjab and supplies Rupnagar district.
Is net metering available for factories and commercial buildings in Nangal?
Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Punjab.
How much electricity does a solar plant generate in Nangal?
About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Nangal?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 320 km from Nangal in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 230 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Nangal
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- New and Renewable Sources of Energy (NRSE) Policy, 2012, Government of Punjab notification of 26 December 2012, with the amendment of 9 July 2015
- New and Renewable Sources of Energy (NRSE) Policy, 2012, clause 4.2 (Government of Punjab, 26 December 2012), and the PEDA website
- PSERC (Grid Interactive Rooftop Solar Photo Voltaic Systems) Regulations, 2021, with the Third Amendment notified on 7 April 2026 (Punjab Government Gazette, 11 April 2026)
- PSERC Tariff Order FY 2026-27 for PSPCL (order dated 06 March 2026), Chapter 1, page 1
- PSERC tariff order for PSPCL for 2026-27, dated 6 March 2026, Annexure II (Schedules of Tariff), Schedule SI.3
- PVGIS, European Commission Joint Research Centre (solar output model)
- Punjab State Electricity Regulatory Commission
- State Election Commission Punjab: "List of District-wise Class-I, II, III and Nagar Panchayats in the State of Punjab" (scanned page 5, posted 14 Aug 2023; includes bodies constituted up to 30-12-2021; 23 districts; quote read from the scanned image)