Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Pakur, Jharkhand.
Pakur at a glance for solar projects
| District and state | Pakur district, Jharkhand |
|---|---|
| Electricity supply | Jharkhand Bijli Vitran Nigam Limited (JBVNL), the state distribution company, holds a licence covering the whole of Jharkhand, including Pakur district. |
| Electricity regulator | Jharkhand State Electricity Regulatory Commission (JSERC) |
| State renewable energy agency | Jharkhand Renewable Energy Development Agency (JREDA) |
| State solar policy | Jharkhand State Solar Policy 2022 (notified 5 July 2022, valid for five years unless another policy replaces it) |
| Rooftop metering for businesses | Net or gross metering for rooftop plants of 1 kWp to 2 MWp, up to 100% of sanctioned load |
| Modelled solar output | about 1,280 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1120 km from Pakur in a straight line |
Solar services in Pakur
- Solar EPC Company in Pakur
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Pakur
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Pakur
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Pakur
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Pakur
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Pakur
One contract from survey to a working plant, with approvals and handover included.
Pakur: industrial areas
JIADA, the Jharkhand Industrial Area Development Authority, lists Tasariya, Maheshpur, Pakur among its industrial areas in Pakur district.
The Government of India's One District One Product (ODOP) list names Jute as the product of Pakur district.
Solar output in Pakur
A solar plant in Pakur is modelled to produce about 1,280 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the High Tension Service (HTS), JBVNL, 6.6 kV and above energy charge of ₹6.40 per kVAh (JSERC tariff order for JBVNL dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A fixed charge of ₹400 per kVA per month also applies. Billing demand is the recorded maximum demand or 75% of contract demand, whichever is higher. The rate for HTSS (induction or arc furnaces of 300 kVA and more) is ₹5.80 per kVAh. Time-of-day billing is an option for HTS consumers: 85% of the rate from 10 PM to 6 AM, 100% from 10 AM to 6 PM and 120% from 6 AM to 10 AM and 6 PM to 10 PM. The order calls these ceiling tariffs. Tata Steel, Tata Steel UISL, DVC and SAIL Bokaro have their own tariff schedules, so rates differ in their areas.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.40 per kVAh |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹8.2 lakh |
| 500 kW | 6.4 lakh units | 5,000 sq m | ₹41.0 lakh |
| 1 MW | 12.8 lakh units | 10,000 sq m | ₹81.9 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Pakur
For a rooftop array in Pakur the strongest month is March, at about 136 units for each kW installed, and the weakest is July, at about 88. For a ground-mounted array at a 30° tilt the strongest month is March (about 143) and the weakest is July (about 80). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 112 | 136 |
| February | 114 | 130 |
| March | 136 | 143 |
| April | 129 | 124 |
| May | 117 | 106 |
| June | 98 | 87 |
| July | 88 | 80 |
| August | 91 | 86 |
| September | 90 | 90 |
| October | 103 | 112 |
| November | 103 | 122 |
| December | 103 | 128 |
Somaya Solar projects near Pakur
These are the Somaya Solar projects closest to Pakur, with straight-line distances. They are shown as references and are not in Pakur unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 760 km from Pakur. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 870 km from Pakur. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1020 km from Pakur. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Pakur
Which electricity company handles solar connections in Pakur?
Jharkhand Bijli Vitran Nigam Limited (JBVNL), the state distribution company, holds a licence covering the whole of Jharkhand, including Pakur district.
Is net metering available for factories and commercial buildings in Pakur?
Net or gross metering for rooftop plants of 1 kWp to 2 MWp, up to 100% of sanctioned load. The rule is the same across Jharkhand.
How much electricity does a solar plant generate in Pakur?
About 1,280 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.8 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Pakur?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1120 km from Pakur in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 760 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Pakur
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Census of India 2011, District Census Handbooks, town directory spreadsheet for Jharkhand (DH_2011_DCHB_Town_Release_2000.xlsx; saved as pdf-jhod/census-dchb-town-release.xlsx). Row format: district | sub-district | town
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- JIADA (Jharkhand Industrial Area Development Authority), Industrial Area list: serial | industrial area | region | district
- JSERC (Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering) Regulations, 2015, as amended by the First Amendment (19 February 2019) to the Seventh Amendment (30 January 2026); JSERC (Group Net Metering and Virtual Net Metering) Regulations, 2024; JSERC order for JBVNL dated 25 March 2026
- JSERC order for JBVNL dated 25 March 2026, paragraph 1.14 (saved copy: txt-jhod/JBVNL-2026.txt)
- JSERC tariff order for JBVNL, 25 March 2026 (chapter 13, Tariff Schedule)
- Jharkhand State Electricity Regulatory Commission
- Jharkhand State Solar Policy 2022 (Department of Energy, Government of Jharkhand, Resolution dated 5 July 2022)
- PVGIS, European Commission Joint Research Centre (solar output model)