Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Phulbani, Odisha. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Phulbani at a glance for solar projects
| District and state | Kandhamal district, Odisha |
|---|---|
| Electricity supply | TP Southern Odisha Distribution Limited (TPSODL) supplies electricity in Kandhamal district, one of the districts it lists as its area. |
| Electricity regulator | Odisha Electricity Regulatory Commission (OERC) |
| State renewable energy agency | Odisha Renewable Energy Development Agency (OREDA Limited) (OREDA) |
| State solar policy | Odisha Renewable Energy Policy, 2022 (in force until 31 March 2030 unless replaced earlier) |
| Rooftop metering for businesses | Net metering up to 500 kW or the sanctioned load, whichever is lower |
| Modelled solar output | about 1,310 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1140 km from Phulbani in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Phulbani
In Odisha, net metering for rooftop and other solar plants is set by an OERC order of 19 August 2016. The order covers all consumer categories, including industrial and commercial ones. The order has been amended on 17 January 2018, 5 May 2022 and 27 November 2025. Since the May 2022 amendment, net metering is allowed for loads up to 500 kW or the sanctioned load, whichever is lower.
The size limits, charges and other conditions for Odisha are on the page Solar EPC Company in Odisha.
In Phulbani the application for connection and metering goes to TPSODL.
What a plant produces in Phulbani
A solar plant in Phulbani is modelled to produce about 1,310 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industry, HT, load factor 60% or less energy charge of ₹5.85 per kVAh (OERC common tariff order for 2026-27, dated 24 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The energy charge is ₹4.75 per kVAh when the monthly load factor is above 60%. A demand charge of ₹250 per kVA per month and a customer service charge of ₹250 per month also apply. Time-of-day tariff applies from 1 July 2026 to consumers with smart or AMR meters and contract demand above 10 kW: 10% less in solar hours (8 AM to 4 PM) and 1.1 times in peak hours (6 PM to midnight). The rates exclude electricity duty and other levies. The same rates apply in all four licensee areas.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹5.85 per kVAh |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹7.7 lakh |
| 500 kW | 6.5 lakh units | 5,000 sq m | ₹38.3 lakh |
| 1 MW | 13.1 lakh units | 10,000 sq m | ₹76.6 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Phulbani
The Government of India's One District One Product (ODOP) list names Turmeric as the product of Kandhamal district.
EPC projects by Somaya Solar near Phulbani
These are the Somaya Solar projects closest to Phulbani, with straight-line distances. They are shown as references and are not in Phulbani unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 540 km from Phulbani. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 930 km from Phulbani. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1100 km from Phulbani. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Phulbani
Which electricity company handles solar connections in Phulbani?
TP Southern Odisha Distribution Limited (TPSODL) supplies electricity in Kandhamal district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Phulbani?
Net metering up to 500 kW or the sanctioned load, whichever is lower. The rule is the same across Odisha.
How much electricity does a solar plant generate in Phulbani?
About 1,310 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.1 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Phulbani?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1140 km from Phulbani in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 540 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Phulbani
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- OERC common tariff order for TPNODL, TPWODL, TPCODL and TPSODL for 2026-27, 24 March 2026, Table 1 licensed areas (txt-jhod/oerc-discom-order-2627.txt)
- OERC order on Net Metering / Bi-directional Metering of 19 August 2016, as amended up to 17 January 2018, by the order of 5 May 2022 and by the order of 27 November 2025
- OERC retail supply tariff notification for 2026-27, dated 24 March 2026 (schedule, item 23 and note on slab rate of energy charges)
- OREDA Limited website, About OREDA Limited
- Odisha Electricity Regulatory Commission
- Odisha Housing & Urban Development Department, District Wise ULBs and Population (list of 115 ULBs; saved as html-jhod/odisha-ulb-district.html). Row format: district | municipality or NAC
- Odisha Renewable Energy Policy, 2022 (Energy Department resolution No. 11757 of 30 November 2022, Odisha Gazette Extraordinary No. 3354)
- PVGIS, European Commission Joint Research Centre (solar output model)