Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Ramagundam, Telangana.

Ramagundam at a glance for solar projects

District and statePeddapalli district, Telangana
Electricity supplyNorthern Power Distribution Company of Telangana Limited (TGNPDCL) supplies electricity in Peddapalli district, one of the districts it lists as its area.
Electricity regulatorTelangana Electricity Regulatory Commission (TGERC)
State renewable energy agencyTelangana Renewable Energy Development Corporation Limited (TGREDCO)
State solar policyTelangana Clean and Green Energy Policy, 2025 (G.O.Ms.No.2 of 11 January 2025, in operation for 10 years)
Rooftop metering for businessesNet metering up to 500 kWp and gross metering up to 1 MWp, within 80% of sanctioned load for industrial and commercial consumers
Modelled solar outputabout 1,350 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1120 km from Ramagundam in a straight line

Solar services in Ramagundam

Ramagundam: industrial areas

TGIIC, the Telangana Industrial Infrastructure Corporation, lists Ida Ramagundam among its industrial areas in Peddapalli district.

The Government of India's One District One Product (ODOP) list names Rice based products as the product of Peddapalli district.

Solar output in Ramagundam

A solar plant in Ramagundam is modelled to produce about 1,350 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-I(A) Industry General, 11 kV energy charge of ₹7.65 per unit (TGERC Retail Supply Tariff Order for FY 2026-27, in force from 1 April 2026 to 31 March 2027). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹7.15 per unit at 33 kV and ₹6.65 at 132 kV and above. It is the same for TGSPDCL and TGNPDCL. A demand charge of ₹500 per kVA per month also applies. It is charged on the maximum demand recorded in the month or 80% of the contracted demand, whichever is higher. A minimum energy charge of 50 kVAh per kVA of billing demand per month applies. Time-of-day: plus ₹1.50 per unit from 6 am to 10 am and 6 pm to 10 pm, and less ₹0.50 per unit from 10 am to 6 pm. Fuel surcharge adjustment is extra, and the rates exclude electricity duty.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.65 per unit
100 kW1.4 lakh units1,000 sq m₹10.3 lakh
500 kW6.8 lakh units5,000 sq m₹51.6 lakh
1 MW13.5 lakh units10,000 sq m₹1.03 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Ramagundam

For a rooftop array in Ramagundam the strongest month is March, at about 138 units for each kW installed, and the weakest is July, at about 80. For a ground-mounted array at a 24° tilt the strongest month is March (about 141) and the weakest is July (about 74). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January124139
February122131
March138141
April133129
May133123
June10192
July8074
August8783
September9494
October116122
November111124
December117134

Somaya Solar projects near Ramagundam

These are the Somaya Solar projects closest to Ramagundam, with straight-line distances. They are shown as references and are not in Ramagundam unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 570 km from Ramagundam. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1020 km from Ramagundam. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1130 km from Ramagundam. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Ramagundam

Which electricity company handles solar connections in Ramagundam?

Northern Power Distribution Company of Telangana Limited (TGNPDCL) supplies electricity in Peddapalli district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Ramagundam?

Net metering up to 500 kWp and gross metering up to 1 MWp, within 80% of sanctioned load for industrial and commercial consumers. The rule is the same across Telangana.

How much electricity does a solar plant generate in Ramagundam?

About 1,350 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.5 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Ramagundam?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1120 km from Ramagundam in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 570 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Ramagundam

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image