Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Soro, Odisha.

Soro at a glance for solar projects

District and stateBalasore district, Odisha
Electricity supplyTP Northern Odisha Distribution Limited (TPNODL) supplies electricity in Balasore district, one of the districts it lists as its area.
Electricity regulatorOdisha Electricity Regulatory Commission (OERC)
State renewable energy agencyOdisha Renewable Energy Development Agency (OREDA Limited) (OREDA)
State solar policyOdisha Renewable Energy Policy, 2022 (in force until 31 March 2030 unless replaced earlier)
Rooftop metering for businessesNet metering up to 500 kW or the sanctioned load, whichever is lower
Modelled solar outputabout 1,330 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1240 km from Soro in a straight line

Solar services in Soro

Local points for solar projects in Soro

The Government of India's One District One Product (ODOP) list names Marine Products and Stone Craft as the products of Balasore district.

Solar output in Soro

A solar plant in Soro is modelled to produce about 1,330 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industry, HT, load factor 60% or less energy charge of ₹5.85 per kVAh (OERC common tariff order for 2026-27, dated 24 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The energy charge is ₹4.75 per kVAh when the monthly load factor is above 60%. A demand charge of ₹250 per kVA per month and a customer service charge of ₹250 per month also apply. Time-of-day tariff applies from 1 July 2026 to consumers with smart or AMR meters and contract demand above 10 kW: 10% less in solar hours (8 AM to 4 PM) and 1.1 times in peak hours (6 PM to midnight). The rates exclude electricity duty and other levies. The same rates apply in all four licensee areas.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹5.85 per kVAh
100 kW1.3 lakh units1,000 sq m₹7.8 lakh
500 kW6.7 lakh units5,000 sq m₹38.9 lakh
1 MW13.3 lakh units10,000 sq m₹77.8 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Soro

For a rooftop array in Soro the strongest month is March, at about 134 units for each kW installed, and the weakest is July, at about 90. For a ground-mounted array at a 26° tilt the strongest month is March (about 139) and the weakest is July (about 83). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January119137
February116127
March134139
April134129
May131120
June10293
July9083
August9086
September9191
October106113
November108123
December110129

Somaya Solar projects near Soro

These are the Somaya Solar projects closest to Soro, with straight-line distances. They are shown as references and are not in Soro unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 710 km from Soro. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1000 km from Soro. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1170 km from Soro. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Soro

Which electricity company handles solar connections in Soro?

TP Northern Odisha Distribution Limited (TPNODL) supplies electricity in Balasore district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Soro?

Net metering up to 500 kW or the sanctioned load, whichever is lower. The rule is the same across Odisha.

How much electricity does a solar plant generate in Soro?

About 1,330 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.3 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Soro?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1240 km from Soro in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 710 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Soro

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image