Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Sunam, Punjab.

Sunam at a glance for solar projects

District and stateSangrur district, Punjab
Electricity supplyPunjab State Power Corporation Limited (PSPCL) is the distribution utility for Punjab and supplies Sangrur district.
Electricity regulatorPunjab State Electricity Regulatory Commission (PSERC)
State renewable energy agencyPunjab Energy Development Agency (PEDA)
State solar policyNew and Renewable Sources of Energy (NRSE) Policy, 2012 (in force until the government notifies a new policy)
Rooftop metering for businessesNet metering up to 500 kWp, within the sanctioned load
Modelled solar outputabout 1,420 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 230 km from Sunam in a straight line

Solar services in Sunam

Local points for solar projects in Sunam

The Government of India's One District One Product (ODOP) list names Vegetable Oil as the product of Sangrur district.

Solar output in Sunam

A solar plant in Sunam is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Supply industrial, General Industry, above 100 kVA and up to 1,000 kVA (11 kV or higher) energy charge of ₹5.90 per kVAh (PSERC tariff order for PSPCL for 2026-27, dated 6 March 2026, in force from 1 April 2026 to 31 March 2027). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Above 1,000 kVA the energy charge is ₹6.00 per kVAh. Fixed charges also apply: ₹210 per kVA per month up to 1,000 kVA and ₹280 above that. Time-of-day rates apply: ₹2.00 per kVAh extra from 6 PM to 10 PM between 16 June and 15 October, and a night rebate from 10 PM to 6 AM of ₹0.50 per kVAh (1 April to 15 June) or ₹1.00 per kVAh (16 October to 31 March). A fuel and power purchase adjustment surcharge is added. The order applies to PSPCL, the distribution licensee for Punjab.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹5.90 per kVAh
100 kW1.4 lakh units1,000 sq m₹8.4 lakh
500 kW7.1 lakh units5,000 sq m₹41.9 lakh
1 MW14.2 lakh units10,000 sq m₹83.8 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Sunam

For a rooftop array in Sunam the strongest month is May, at about 147 units for each kW installed, and the weakest is January, at about 100. For a ground-mounted array at a 33° tilt the strongest month is March (about 146) and the weakest is July (about 99). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January100129
February108128
March135146
April143141
May147134
June131115
July11099
August108103
September110115
October121140
November105133
December101135

Somaya Solar projects near Sunam

These are the Somaya Solar projects closest to Sunam, with straight-line distances. They are shown as references and are not in Sunam unless the line says so.

  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 220 km from Sunam. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 230 km from Sunam. Included net-metering coordination with the local electricity distribution company.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 290 km from Sunam. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Sunam

Which electricity company handles solar connections in Sunam?

Punjab State Power Corporation Limited (PSPCL) is the distribution utility for Punjab and supplies Sangrur district.

Is net metering available for factories and commercial buildings in Sunam?

Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Punjab.

How much electricity does a solar plant generate in Sunam?

About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Sunam?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 230 km from Sunam in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 220 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Sunam

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image