Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Tapa, Punjab.

Tapa at a glance for solar projects

District and stateBarnala district, Punjab
Electricity supplyPunjab State Power Corporation Limited (PSPCL) is the distribution utility for Punjab and supplies Barnala district.
Electricity regulatorPunjab State Electricity Regulatory Commission (PSERC)
State renewable energy agencyPunjab Energy Development Agency (PEDA)
State solar policyNew and Renewable Sources of Energy (NRSE) Policy, 2012 (in force until the government notifies a new policy)
Rooftop metering for businessesNet metering up to 500 kWp, within the sanctioned load
Modelled solar outputabout 1,420 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 270 km from Tapa in a straight line

Solar services in Tapa

Solar output in Tapa

A solar plant in Tapa is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Supply industrial, General Industry, above 100 kVA and up to 1,000 kVA (11 kV or higher) energy charge of ₹5.90 per kVAh (PSERC tariff order for PSPCL for 2026-27, dated 6 March 2026, in force from 1 April 2026 to 31 March 2027). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Above 1,000 kVA the energy charge is ₹6.00 per kVAh. Fixed charges also apply: ₹210 per kVA per month up to 1,000 kVA and ₹280 above that. Time-of-day rates apply: ₹2.00 per kVAh extra from 6 PM to 10 PM between 16 June and 15 October, and a night rebate from 10 PM to 6 AM of ₹0.50 per kVAh (1 April to 15 June) or ₹1.00 per kVAh (16 October to 31 March). A fuel and power purchase adjustment surcharge is added. The order applies to PSPCL, the distribution licensee for Punjab.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹5.90 per kVAh
100 kW1.4 lakh units1,000 sq m₹8.4 lakh
500 kW7.1 lakh units5,000 sq m₹41.9 lakh
1 MW14.2 lakh units10,000 sq m₹83.8 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Tapa

For a rooftop array in Tapa the strongest month is May, at about 146 units for each kW installed, and the weakest is January, at about 99. For a ground-mounted array at a 33° tilt the strongest month is March (about 145) and the weakest is July (about 102). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January99128
February107127
March134145
April142140
May146133
June131116
July113102
August111106
September111116
October120139
November104131
December100134

Somaya Solar projects near Tapa

These are the Somaya Solar projects closest to Tapa, with straight-line distances. They are shown as references and are not in Tapa unless the line says so.

  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 260 km from Tapa. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 270 km from Tapa. Included net-metering coordination with the local electricity distribution company.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 340 km from Tapa. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Tapa

Which electricity company handles solar connections in Tapa?

Punjab State Power Corporation Limited (PSPCL) is the distribution utility for Punjab and supplies Barnala district.

Is net metering available for factories and commercial buildings in Tapa?

Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Punjab.

How much electricity does a solar plant generate in Tapa?

About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Tapa?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 270 km from Tapa in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 260 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Tapa

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image