Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Tirupati, Andhra Pradesh as an EPC contractor: engineering, supply, construction and commissioning.
What Andhra Pradesh's policy says about large solar plants
The Andhra Pradesh Integrated Clean Energy Policy, 2024 is the state's policy for solar, wind, storage and other clean energy projects. The Energy Department issued it on 30 October 2024 and approved operational guidelines for it on 28 February 2025. The policy text itself and its period of validity were not read from an official copy.
Open access for green energy in Andhra Pradesh follows APERC's Green Energy Open Access, Charges and Banking Regulation, 2024 (Regulation No. 3 of 2024). That regulation was not read, so its minimum load, captive limits and banking charge are not given here. The tariff order for 2026-27 sets the cross-subsidy surcharge.
The charges, exemptions and conditions for Andhra Pradesh are on the page Utility-Scale Solar in Andhra Pradesh.
Output and land at megawatt scale in Tirupati
A solar plant in Tirupati is modelled to produce about 1,350 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (16°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 67.5 lakh units | 20 to 25 acres |
| 10 MW | 1.35 crore units | 40 to 50 acres |
| 25 MW | 3.38 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Tirupati
These are the Somaya Solar projects closest to Tirupati, with straight-line distances. They are shown as references and are not in Tirupati unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1140 km from Tirupati. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1700 km from Tirupati. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Tirupati
Which electricity company handles solar connections in Tirupati?
Southern Power Distribution Company of Andhra Pradesh Limited (APSPDCL) supplies electricity in Tirupati district, one of the districts it lists as its area.
How much electricity does a solar plant generate in Tirupati?
About 1,350 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.5 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Tirupati?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1680 km from Tirupati in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1140 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Tirupati
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- APERC retail supply tariff order for FY 2026-27, dated 25 March 2026 (Chapter XII); G.O.Ms.No.26, Energy (Power-II) Department, 28 February 2025 (sections 9 and 10)
- APSPDCL recruitment notification, 24 June 2026
- G.O.Ms.No.26, Energy (Power-II) Department, 28 February 2025, operational guidelines for the Andhra Pradesh Integrated Clean Energy Policy, 2024
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)