Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Alappuzha, Kerala. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Local points for solar projects in Alappuzha
The Government of India's One District One Product (ODOP) list names Coir products as the product of Alappuzha district.
Metering rules for business rooftops in Alappuzha
In Kerala an industrial consumer can install rooftop or other solar of 1 kW to 500 kW under net metering, within the connected load or contract demand. Larger plants go under net billing (up to 1,000 kW, or 3,000 kW with storage) or gross metering (up to 3,000 kW). The rules are in the KSERC (Renewable Energy and Related Matters) Regulations, 2025, notified on 5 November 2025. They replaced the 2020 net metering regulations, and KSERC's list shows no later amendment.
The size limits, charges and other conditions for Kerala are on the page Commercial & Industrial Solar in Kerala.
In Alappuzha the application for connection and metering goes to KSEB.
Output and bill value for a rooftop plant in Alappuzha
A solar plant in Alappuzha is modelled to produce about 1,280 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-I(A) Industry (high tension, 11 kV to 33 kV) energy charge of ₹6.25 per unit (KSERC order of 5 December 2024 in OP 18/2023: schedule of tariff for 5 December 2024 to 31 March 2027; the rate shown applies from 1 April 2025). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The energy charge was ₹6.20 per unit from 5 December 2024 to 31 March 2025. A demand charge also applies each month: ₹420 per kVA of billing demand from 1 April 2025. Billing demand is the recorded maximum demand or 75% of the contract demand, whichever is higher. HT consumers are billed on time of day: 100% of the rate from 6:00 to 18:00, 150% from 18:00 to 22:00 and 75% from 22:00 to 6:00. The schedule applies to KSEB Ltd and the other licensees, and the rates exclude electricity duty and surcharge.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.25 per unit |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹8.0 lakh |
| 250 kW | 3.2 lakh units | 2,500 sq m | ₹20.0 lakh |
| 500 kW | 6.4 lakh units | 5,000 sq m | ₹40.0 lakh |
| 1 MW | 12.8 lakh units | 10,000 sq m | ₹80.0 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Alappuzha
These are the Somaya Solar projects closest to Alappuzha, with straight-line distances. They are shown as references and are not in Alappuzha unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 2080 km from Alappuzha. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 2210 km from Alappuzha. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 2280 km from Alappuzha. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Alappuzha
Which electricity company handles solar connections in Alappuzha?
KSEB Ltd, the state electricity board company, supplies Alappuzha district outside the small areas held by special licensees such as industrial parks.
Is net metering available for factories and commercial buildings in Alappuzha?
Net metering up to 500 kW for industrial consumers; net billing up to 1 MW (3 MW with storage). The rule is the same across Kerala.
How much electricity does a solar plant generate in Alappuzha?
About 1,280 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.8 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Alappuzha?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 2130 km from Alappuzha in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 2080 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Alappuzha
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- KSERC (Renewable Energy and Related Matters) Regulations, 2025, notified 5 November 2025 (Gazette 6 November 2025)
- KSERC order of 21 May 2026 in OP 63/2025 (KSEB Ltd true-up), para 5.1
- KSERC schedule of tariff and terms and conditions for retail supply, 5 December 2024 to 31 March 2027 (order of 5 December 2024 in OP 18/2023), Part B
- PVGIS, European Commission Joint Research Centre (solar output model)