Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Alappuzha, Kerala. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.

Alappuzha at a glance for solar projects

District and stateAlappuzha district, Kerala
Electricity supplyKSEB Ltd, the state electricity board company, supplies Alappuzha district outside the small areas held by special licensees such as industrial parks.
Electricity regulatorKerala State Electricity Regulatory Commission (KSERC)
State renewable energy agencyAgency for New and Renewable Energy Research and Technology (ANERT)
State solar policyKerala Solar Energy Policy, 2013 (G.O.(P) No. 49/2013/PD of 25 November 2013; stays in force until another policy replaces it)
Rooftop metering for businessesNet metering up to 500 kW for industrial consumers; net billing up to 1 MW (3 MW with storage)
Modelled solar outputabout 1,280 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 2130 km from Alappuzha in a straight line

What our EPC scope covers

An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.

  • Site survey and a study of your electricity use and bills
  • Plant design, drawings and equipment selection
  • Supply of modules, inverters, mounting structures and electrical equipment
  • Installation, testing and commissioning
  • Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
  • Operation and maintenance after handover, where contracted

More detail: Solar EPC Company across India.

Connecting a plant to the grid in Alappuzha

In Kerala an industrial consumer can install rooftop or other solar of 1 kW to 500 kW under net metering, within the connected load or contract demand. Larger plants go under net billing (up to 1,000 kW, or 3,000 kW with storage) or gross metering (up to 3,000 kW). The rules are in the KSERC (Renewable Energy and Related Matters) Regulations, 2025, notified on 5 November 2025. They replaced the 2020 net metering regulations, and KSERC's list shows no later amendment.

The size limits, charges and other conditions for Kerala are on the page Solar EPC Company in Kerala.

In Alappuzha the application for connection and metering goes to KSEB.

What a plant produces in Alappuzha

A solar plant in Alappuzha is modelled to produce about 1,280 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-I(A) Industry (high tension, 11 kV to 33 kV) energy charge of ₹6.25 per unit (KSERC order of 5 December 2024 in OP 18/2023: schedule of tariff for 5 December 2024 to 31 March 2027; the rate shown applies from 1 April 2025). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The energy charge was ₹6.20 per unit from 5 December 2024 to 31 March 2025. A demand charge also applies each month: ₹420 per kVA of billing demand from 1 April 2025. Billing demand is the recorded maximum demand or 75% of the contract demand, whichever is higher. HT consumers are billed on time of day: 100% of the rate from 6:00 to 18:00, 150% from 18:00 to 22:00 and 75% from 22:00 to 6:00. The schedule applies to KSEB Ltd and the other licensees, and the rates exclude electricity duty and surcharge.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.25 per unit
100 kW1.3 lakh units1,000 sq m₹8.0 lakh
500 kW6.4 lakh units5,000 sq m₹40.0 lakh
1 MW12.8 lakh units10,000 sq m₹80.0 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Local points for solar projects in Alappuzha

The Government of India's One District One Product (ODOP) list names Coir products as the product of Alappuzha district.

EPC projects by Somaya Solar near Alappuzha

These are the Somaya Solar projects closest to Alappuzha, with straight-line distances. They are shown as references and are not in Alappuzha unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1650 km from Alappuzha. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 2080 km from Alappuzha. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 2170 km from Alappuzha. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Alappuzha

Which electricity company handles solar connections in Alappuzha?

KSEB Ltd, the state electricity board company, supplies Alappuzha district outside the small areas held by special licensees such as industrial parks.

Is net metering available for factories and commercial buildings in Alappuzha?

Net metering up to 500 kW for industrial consumers; net billing up to 1 MW (3 MW with storage). The rule is the same across Kerala.

How much electricity does a solar plant generate in Alappuzha?

About 1,280 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.8 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Alappuzha?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 2130 km from Alappuzha in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1650 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Alappuzha

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image