Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Alibag, Maharashtra.

Alibag at a glance for solar projects

District and stateRaigad district, Maharashtra
Electricity supplyMaharashtra State Electricity Distribution Company Limited (MSEDCL) supplies electricity across Maharashtra apart from Mumbai and a few small areas with their own licensees (such as some IT parks and SEZs), including Raigad district.
Electricity regulatorMaharashtra Electricity Regulatory Commission (MERC)
State renewable energy agencyMaharashtra Energy Development Agency (MEDA)
State solar policyMaharashtra Renewable Energy and Energy Storage Policy 2025-26 to 2035-36 (Government Resolution of 18 March 2026, in force until 31 March 2036)
Rooftop metering for businessesNet metering up to 5 MW or the contract demand, whichever is lower; net billing and gross metering also allowed
Modelled solar outputabout 1,400 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1210 km from Alibag in a straight line

Solar services in Alibag

Local points for solar projects in Alibag

The Government of India's One District One Product (ODOP) list names Marine Produce and Iron and Steel as the products of Raigad district.

Solar output in Alibag

A solar plant in Alibag is modelled to produce about 1,400 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the MSEDCL HT I (A): HT - Industry energy charge of ₹8.44 per kVAh (MERC order of 25 March 2026 in Case No. 75 of 2025 (review of MSEDCL's MYT order of 28 March 2025), rates for 2026-27 in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is MSEDCL's energy charge for 2026-27. HT consumers (11 kV to 33 kV) also pay a wheeling charge of ₹0.81 per kVAh, for a total of ₹9.25. EHV consumers (66 kV and above) pay no wheeling charge. A demand charge of ₹650 per kVA per month also applies. Time of day: energy used from 9 AM to 5 PM gets a rebate of 15% of the energy charge from April to September and 25% from October to March. Energy used from 5 PM to midnight costs 20% more. The tariffs exclude electricity duty and taxes. Mumbai licensees have their own MERC orders of 28 March 2025 with lower 2026-27 rates for HT I industry, each with a demand charge of ₹400 per kVA per month: AEML ₹5.73 per kVAh plus ₹0.57 wheeling, Tata Power-D ₹5.67 plus ₹0.69, and BEST ₹5.47 plus ₹0.88.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹8.44 per kVAh
100 kW1.4 lakh units1,000 sq m₹11.8 lakh
500 kW7.0 lakh units5,000 sq m₹59.1 lakh
1 MW14.0 lakh units10,000 sq m₹1.18 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Alibag

For a rooftop array in Alibag the strongest month is March, at about 151 units for each kW installed, and the weakest is July, at about 71. For a ground-mounted array at a 25° tilt the strongest month is March (about 154) and the weakest is July (about 66). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January134153
February132143
March151154
April147141
May141129
June9283
July7166
August8278
September9291
October118125
November119133
December124142

Somaya Solar projects near Alibag

These are the Somaya Solar projects closest to Alibag, with straight-line distances. They are shown as references and are not in Alibag unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 970 km from Alibag. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1250 km from Alibag. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1270 km from Alibag. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Alibag

Which electricity company handles solar connections in Alibag?

Maharashtra State Electricity Distribution Company Limited (MSEDCL) supplies electricity across Maharashtra apart from Mumbai and a few small areas with their own licensees (such as some IT parks and SEZs), including Raigad district.

Is net metering available for factories and commercial buildings in Alibag?

Net metering up to 5 MW or the contract demand, whichever is lower; net billing and gross metering also allowed. The rule is the same across Maharashtra.

How much electricity does a solar plant generate in Alibag?

About 1,400 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.0 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Alibag?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1210 km from Alibag in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 970 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Alibag

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.