Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Aligarh, Uttar Pradesh.
Aligarh at a glance for solar projects
| District and state | Aligarh district, Uttar Pradesh |
|---|---|
| Electricity supply | Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL), the state distribution company with its head office in Agra, supplies electricity in Aligarh district. Aligarh is one of the districts DVVNL lists in its jurisdiction. |
| Electricity regulator | Uttar Pradesh Electricity Regulatory Commission (UPERC) |
| State renewable energy agency | Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) |
| State solar policy | Uttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier) |
| Rooftop metering for businesses | Net billing or gross metering; no net metering for industry or commerce |
| Modelled solar output | about 1,420 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 110 km from Aligarh in a straight line |
Solar services in Aligarh
- Solar EPC Company in Aligarh
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Aligarh
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Aligarh
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Aligarh
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Aligarh
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Aligarh
One contract from survey to a working plant, with approvals and handover included.
Aligarh: industrial areas and district products
The MSME Development Institute's industrial profile of Aligarh district (2016) lists industrial areas including Tala Nagari Sectors 1 and 2, the CDF industrial area and the industrial estate at the exhibition ground.
Under the state's One District One Product scheme, the products listed for Aligarh district are Locks & Hardware and Metal Craft.
The Government of India's One District One Product (ODOP) list names Lock & Hardware and Metal Handicraft as the products of Aligarh district.
Solar output in Aligarh
A solar plant in Aligarh is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.10 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹10.1 lakh |
| 500 kW | 7.1 lakh units | 5,000 sq m | ₹50.4 lakh |
| 1 MW | 14.2 lakh units | 10,000 sq m | ₹1.01 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Aligarh
For a rooftop array in Aligarh the strongest month is May, at about 147 units for each kW installed, and the weakest is August, at about 96. For a ground-mounted array at a 32° tilt the strongest month is March (about 149) and the weakest is July (about 88). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 109 | 137 |
| February | 114 | 134 |
| March | 140 | 149 |
| April | 145 | 140 |
| May | 147 | 133 |
| June | 126 | 110 |
| July | 97 | 88 |
| August | 96 | 92 |
| September | 105 | 108 |
| October | 122 | 139 |
| November | 109 | 135 |
| December | 107 | 138 |
Somaya Solar projects near Aligarh
These are the Somaya Solar projects closest to Aligarh, with straight-line distances. They are shown as references and are not in Aligarh unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 120 km from Aligarh. In progress. Site access was difficult and was handled with local support.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 170 km from Aligarh. Completed in two months, with five years of operation and maintenance.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 180 km from Aligarh. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
Questions about solar projects in Aligarh
Which electricity company handles solar connections in Aligarh?
Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL), the state distribution company with its head office in Agra, supplies electricity in Aligarh district. Aligarh is one of the districts DVVNL lists in its jurisdiction.
Is net metering available for factories and commercial buildings in Aligarh?
Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.
How much electricity does a solar plant generate in Aligarh?
About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Aligarh?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 110 km from Aligarh in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 120 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Aligarh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- DVVNL website: About Us (districts in its jurisdiction)
- GeoNames (place coordinates, CC BY 4.0)
- Government of Uttar Pradesh e-Nagarsewa portal: list of Nagar Nigams (municipal corporations) with their districts
- MSME-Development Institute Agra (Ministry of MSME, Govt. of India), Brief Industrial Profile Of District ALIGARH, section 2.1 (PDF created 2016-05-31; figures 2011-2012)
- ODOP portal, Government of Uttar Pradesh: Aligarh district page
- PVGIS, European Commission Joint Research Centre (solar output model)
- UPERC (Rooftop Solar PV Grid Interactive Systems Gross/Net Metering) Regulations, 2019, with amendments of 1 June 2022, 17 November 2023 and 3 June 2025; UPERC tariff order of 2 July 2026, paragraph 3.13.5
- UPERC tariff order for 2026-27 for the state distribution companies, dated 2 July 2026
- Uttar Pradesh Electricity Regulatory Commission
- Uttar Pradesh Solar Energy Policy 2022 (Government of Uttar Pradesh)