Somaya Solar Solutions Limited delivers turnkey solar projects in Amarpur, Bihar: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Amarpur

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier (SBPDCL) for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Amarpur

In Bihar, any eligible consumer of NBPDCL or SBPDCL, including commercial and industrial consumers, can install rooftop solar under net metering or gross metering. The system must be at least 1 kWp and may not exceed the consumer's sanctioned or contracted load. The rules are in BERC's Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering Regulations, 2018, as amended on 24 July 2024. On 8 October 2026 BERC published a draft Second Amendment for comment. It was not final when we checked.

The size limits, charges and other conditions for Bihar are on the page Turnkey Solar EPC in Bihar.

In Amarpur the application for connection and metering goes to SBPDCL.

What to expect from the plant in Amarpur

A solar plant in Amarpur is modelled to produce about 1,310 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HTIS-I, 11 kV, contract demand 50 to 1,500 kVA) energy charge of ₹7.98 per kVAh (BERC tariff order for NBPDCL and SBPDCL, dated 18 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The same rate applies in both NBPDCL and SBPDCL areas. A demand charge of ₹550 per kVA per month also applies. It is charged on the maximum demand recorded or 75% of the contract demand, whichever is higher, and demand above 105% of the contract demand is billed at twice the normal charge. The energy charge is ₹7.92 per kVAh for HTIS-II (33 kV, 500 to 15,000 kVA), ₹7.85 at 132 kV, ₹7.79 at 220 kV and ₹7.72 at 400 kV. Induction furnace consumers (HTSS) pay ₹4.94 per kVAh and ₹800 per kVA per month. Time-of-day rates apply to consumers above 10 kW from 1 April 2026: 80% of the energy charge from 9 am to 5 pm and 120% from 5 pm to 11 pm. The tariff is set without any Government of Bihar subsidy. It stays in force until 31 March 2027 or the next tariff order.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.98 per kVAh
100 kW1.3 lakh units1,000 sq m₹10.5 lakh
500 kW6.5 lakh units5,000 sq m₹52.3 lakh
1 MW13.1 lakh units10,000 sq m₹1.05 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Reference projects near Amarpur

These are the Somaya Solar projects closest to Amarpur, with straight-line distances. They are shown as references and are not in Amarpur unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 670 km from Amarpur. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 760 km from Amarpur. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 910 km from Amarpur. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Amarpur

Which electricity company handles solar connections in Amarpur?

South Bihar Power Distribution Company Limited (SBPDCL) supplies electricity in Banka district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Amarpur?

Net or gross metering, up to the sanctioned load; draft change to a 500 kWp net metering cap is pending. The rule is the same across Bihar.

How much electricity does a solar plant generate in Amarpur?

About 1,310 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.1 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Amarpur?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1020 km from Amarpur in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 670 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Amarpur

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image