Somaya Solar Solutions Limited delivers turnkey solar projects in Angul, Odisha: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Angul

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier (TPCODL) for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Angul

In Odisha, net metering for rooftop and other solar plants is set by an OERC order of 19 August 2016. The order covers all consumer categories, including industrial and commercial ones. The order has been amended on 17 January 2018, 5 May 2022 and 27 November 2025. Since the May 2022 amendment, net metering is allowed for loads up to 500 kW or the sanctioned load, whichever is lower.

The size limits, charges and other conditions for Odisha are on the page Turnkey Solar EPC in Odisha.

In Angul the application for connection and metering goes to TPCODL.

What to expect from the plant in Angul

A solar plant in Angul is modelled to produce about 1,270 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industry, HT, load factor 60% or less energy charge of ₹5.85 per kVAh (OERC common tariff order for 2026-27, dated 24 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The energy charge is ₹4.75 per kVAh when the monthly load factor is above 60%. A demand charge of ₹250 per kVA per month and a customer service charge of ₹250 per month also apply. Time-of-day tariff applies from 1 July 2026 to consumers with smart or AMR meters and contract demand above 10 kW: 10% less in solar hours (8 AM to 4 PM) and 1.1 times in peak hours (6 PM to midnight). The rates exclude electricity duty and other levies. The same rates apply in all four licensee areas.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹5.85 per kVAh
100 kW1.3 lakh units1,000 sq m₹7.4 lakh
500 kW6.3 lakh units5,000 sq m₹37.1 lakh
1 MW12.7 lakh units10,000 sq m₹74.3 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Reference projects near Angul

These are the Somaya Solar projects closest to Angul, with straight-line distances. They are shown as references and are not in Angul unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 590 km from Angul. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 940 km from Angul. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1120 km from Angul. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Angul

Which electricity company handles solar connections in Angul?

TP Central Odisha Distribution Limited (TPCODL) supplies electricity in Angul district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Angul?

Net metering up to 500 kW or the sanctioned load, whichever is lower. The rule is the same across Odisha.

How much electricity does a solar plant generate in Angul?

About 1,270 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.7 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Angul?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1160 km from Angul in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 590 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Angul

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.