Somaya Solar Solutions Limited delivers turnkey solar projects in Odisha: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Odisha
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Odisha
In Odisha, net metering for rooftop and other solar plants is set by an OERC order of 19 August 2016. The order covers all consumer categories, including industrial and commercial ones. The order has been amended on 17 January 2018, 5 May 2022 and 27 November 2025. Since the May 2022 amendment, net metering is allowed for loads up to 500 kW or the sanctioned load, whichever is lower.
- The plant may not be larger than the consumer's contract demand. A consumer who wants a bigger plant must apply to raise the contracted load.
- The total solar capacity connected to one distribution transformer may not exceed 75% of that transformer's capacity.
- Gross metering is also defined in the order: all solar energy generated is metered separately from all energy consumed, and the generation is paid at a tariff the Commission fixes.
- The settlement period ends on 31 March. Excess energy carries forward month to month within the same financial year, with no interest. The energy counted is capped at 90% of the year's consumption, any excess above that is free energy, and nothing carries into the next financial year.
- Group net metering and virtual net metering were added on 5 May 2022. The capacity under either may not be less than 5 kW or more than 500 kW. The virtual net metering framework applies to Domestic and Specified Public Purpose consumers and to Government and local authority offices.
- The amendment of 27 November 2025 lets the consumer choose a grid-tied or a hybrid inverter, and the consumer or the distribution company may buy the meter.
- The application fee is ₹500, and permission is normally issued within 15 days if connection is feasible.
What to expect from the plant in Odisha
Solar output changes across Odisha with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,270 to 1,390 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Anandpur | 1,270 | 1,310 |
| Angul | 1,270 | 1,310 |
| Asika | 1,310 | 1,340 |
| Balangir | 1,320 | 1,360 |
| Balasore | 1,370 | 1,410 |
| Bargarh | 1,320 | 1,360 |
| Baripada | 1,310 | 1,360 |
| Barpali | 1,320 | 1,370 |
| Basudebpur | 1,330 | 1,370 |
| Baud | 1,300 | 1,340 |
| Belpahar | 1,320 | 1,370 |
| Bhadrak | 1,330 | 1,370 |
| Bhanjanagar | 1,280 | 1,320 |
| Bhawanipatna | 1,310 | 1,350 |
| Bhuban | 1,280 | 1,310 |
| Bhubaneswar | 1,300 | 1,340 |
| Birmitrapur | 1,320 | 1,370 |
| Brahmapur | 1,360 | 1,390 |
| Brajarajnagar | 1,320 | 1,370 |
| Burla | 1,310 | 1,360 |
| Chhatrapur | 1,390 | 1,420 |
| Choudwar | 1,290 | 1,320 |
| Cuttack | 1,300 | 1,330 |
| Deogarh | 1,320 | 1,360 |
| Dhamanagar | 1,300 | 1,330 |
| Dhenkanal | 1,280 | 1,320 |
| Gunupur | 1,290 | 1,320 |
| Hinjilicut | 1,350 | 1,370 |
| Hirakud | 1,310 | 1,360 |
| Jagatsinghapur | 1,320 | 1,350 |
| Jajpur | 1,300 | 1,330 |
| Jaleshwar | 1,350 | 1,390 |
| Jatani | 1,300 | 1,330 |
| Jeypore | 1,300 | 1,340 |
| Jharsuguda | 1,330 | 1,380 |
| Joda | 1,320 | 1,360 |
| Kantabanji | 1,330 | 1,380 |
| Karanjia | 1,300 | 1,340 |
| Kendraparha | 1,310 | 1,350 |
| Keonjhargarh | 1,300 | 1,340 |
| Khordha | 1,300 | 1,330 |
| Koraput | 1,300 | 1,340 |
| Malakanagiri | 1,270 | 1,300 |
| Paralakhemundi | 1,300 | 1,330 |
| Patamundai | 1,340 | 1,370 |
| Patnagarh | 1,330 | 1,370 |
| Phulbani | 1,310 | 1,350 |
| Polasara | 1,340 | 1,360 |
| Puri | 1,340 | 1,370 |
| Rairangpur | 1,310 | 1,360 |
| Rajgangpur | 1,320 | 1,370 |
| Rayagada | 1,290 | 1,320 |
| Remuna | 1,360 | 1,400 |
| Rourkela | 1,320 | 1,370 |
| Sambalpur | 1,320 | 1,360 |
| Sonepur | 1,320 | 1,360 |
| Soro | 1,330 | 1,370 |
| Sunabeda | 1,310 | 1,340 |
| Sundergarh | 1,330 | 1,380 |
| Talcher | 1,270 | 1,310 |
| Titlagarh | 1,320 | 1,360 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in Odisha
Is net metering available for factories and commercial buildings in Odisha?
In Odisha, net metering for rooftop and other solar plants is set by an OERC order of 19 August 2016. The order covers all consumer categories, including industrial and commercial ones. The order has been amended on 17 January 2018, 5 May 2022 and 27 November 2025. Since the May 2022 amendment, net metering is allowed for loads up to 500 kW or the sanctioned load, whichever is lower.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Odisha
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.