Commercial and Industrial Rooftop Solar in Odisha

Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Odisha. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Metering rules for business rooftops in Odisha

In Odisha, net metering for rooftop and other solar plants is set by an OERC order of 19 August 2016. The order covers all consumer categories, including industrial and commercial ones. The order has been amended on 17 January 2018, 5 May 2022 and 27 November 2025. Since the May 2022 amendment, net metering is allowed for loads up to 500 kW or the sanctioned load, whichever is lower.

  • The plant may not be larger than the consumer's contract demand. A consumer who wants a bigger plant must apply to raise the contracted load.
  • The total solar capacity connected to one distribution transformer may not exceed 75% of that transformer's capacity.
  • Gross metering is also defined in the order: all solar energy generated is metered separately from all energy consumed, and the generation is paid at a tariff the Commission fixes.
  • The settlement period ends on 31 March. Excess energy carries forward month to month within the same financial year, with no interest. The energy counted is capped at 90% of the year's consumption, any excess above that is free energy, and nothing carries into the next financial year.
  • Group net metering and virtual net metering were added on 5 May 2022. The capacity under either may not be less than 5 kW or more than 500 kW. The virtual net metering framework applies to Domestic and Specified Public Purpose consumers and to Government and local authority offices.
  • The amendment of 27 November 2025 lets the consumer choose a grid-tied or a hybrid inverter, and the consumer or the distribution company may buy the meter.
  • The application fee is ₹500, and permission is normally issued within 15 days if connection is feasible.

Output and bill value for a rooftop plant in Odisha

Solar output changes across Odisha with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,270 to 1,390 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Anandpur1,2701,310
Angul1,2701,310
Asika1,3101,340
Balangir1,3201,360
Balasore1,3701,410
Bargarh1,3201,360
Baripada1,3101,360
Barpali1,3201,370
Basudebpur1,3301,370
Baud1,3001,340
Belpahar1,3201,370
Bhadrak1,3301,370
Bhanjanagar1,2801,320
Bhawanipatna1,3101,350
Bhuban1,2801,310
Bhubaneswar1,3001,340
Birmitrapur1,3201,370
Brahmapur1,3601,390
Brajarajnagar1,3201,370
Burla1,3101,360
Chhatrapur1,3901,420
Choudwar1,2901,320
Cuttack1,3001,330
Deogarh1,3201,360
Dhamanagar1,3001,330
Dhenkanal1,2801,320
Gunupur1,2901,320
Hinjilicut1,3501,370
Hirakud1,3101,360
Jagatsinghapur1,3201,350
Jajpur1,3001,330
Jaleshwar1,3501,390
Jatani1,3001,330
Jeypore1,3001,340
Jharsuguda1,3301,380
Joda1,3201,360
Kantabanji1,3301,380
Karanjia1,3001,340
Kendraparha1,3101,350
Keonjhargarh1,3001,340
Khordha1,3001,330
Koraput1,3001,340
Malakanagiri1,2701,300
Paralakhemundi1,3001,330
Patamundai1,3401,370
Patnagarh1,3301,370
Phulbani1,3101,350
Polasara1,3401,360
Puri1,3401,370
Rairangpur1,3101,360
Rajgangpur1,3201,370
Rayagada1,2901,320
Remuna1,3601,400
Rourkela1,3201,370
Sambalpur1,3201,360
Sonepur1,3201,360
Soro1,3301,370
Sunabeda1,3101,340
Sundergarh1,3301,380
Talcher1,2701,310
Titlagarh1,3201,360

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Questions about solar projects in Odisha

Is net metering available for factories and commercial buildings in Odisha?

In Odisha, net metering for rooftop and other solar plants is set by an OERC order of 19 August 2016. The order covers all consumer categories, including industrial and commercial ones. The order has been amended on 17 January 2018, 5 May 2022 and 27 November 2025. Since the May 2022 amendment, net metering is allowed for loads up to 500 kW or the sanctioned load, whichever is lower.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Odisha

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image