Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Avadi, Tamil Nadu. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Avadi at a glance for solar projects
| District and state | Tiruvallur district, Tamil Nadu |
|---|---|
| Electricity supply | Tamil Nadu Power Distribution Corporation Limited (TNPDCL, formerly TANGEDCO) is the state distribution company and supplies Tiruvallur district. |
| Electricity regulator | Tamil Nadu Electricity Regulatory Commission (TNERC) |
| State renewable energy agency | Tamil Nadu Energy Development Agency (TEDA) |
| Rooftop metering for businesses | Net metering for homes only; commercial and industrial users get net billing (net feed-in) up to the sanctioned load or 999 kW |
| Modelled solar output | about 1,360 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1750 km from Avadi in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Avadi
In Tamil Nadu, net metering is open only to domestic consumers. Commercial and industrial consumers, at any voltage, can install rooftop solar under net billing (also called net feed-in) up to their sanctioned load or contract demand, or 999 kW, whichever is lower. The rules are in the TNERC Grid Interactive Solar PV Energy Generating Systems Regulations, 2021, which apply to loads of less than 1 MW.
The size limits, charges and other conditions for Tamil Nadu are on the page Solar EPC Company in Tamil Nadu.
In Avadi the application for connection and metering goes to TNPDCL.
What a plant produces in Avadi
A solar plant in Avadi is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-I Industries, Factories, IT services energy charge of ₹7.50 per kWh (TNERC suo-motu tariff order No. 6 of 2025, dated 30 June 2025, in force from 1 July 2025). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹608 per kVA per month also applies. It is charged on the recorded kVA demand or 90% of the contract demand, whichever is higher. Energy used from 6 AM to 10 AM and from 6 PM to 10 PM is billed at 25% extra, and energy used from 10 PM to 5 AM gets a 5% reduction. The rates exclude electricity tax and duty. TNPDCL is the only licensee named in the order. The order says its tariffs stay valid until the next order.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.50 per kWh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹10.2 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹51.0 lakh |
| 1 MW | 13.6 lakh units | 10,000 sq m | ₹1.02 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Avadi
The Government of India's One District One Product (ODOP) list names Engineering and Auto components and Engineering Tools and Electronics as the products of Tiruvallur district.
EPC projects by Somaya Solar near Avadi
These are the Somaya Solar projects closest to Avadi, with straight-line distances. They are shown as references and are not in Avadi unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1190 km from Avadi. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1640 km from Avadi. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1760 km from Avadi. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Avadi
Which electricity company handles solar connections in Avadi?
Tamil Nadu Power Distribution Corporation Limited (TNPDCL, formerly TANGEDCO) is the state distribution company and supplies Tiruvallur district.
Is net metering available for factories and commercial buildings in Avadi?
Net metering for homes only; commercial and industrial users get net billing (net feed-in) up to the sanctioned load or 999 kW. The rule is the same across Tamil Nadu.
How much electricity does a solar plant generate in Avadi?
About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Avadi?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1750 km from Avadi in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1190 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Avadi
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, "Details of Urban Local bodies and Areas under ..." (List-of-ULB.pdf), row: State | District code | District | City code | ULB name | ULB type
- PIB, Ministry of New and Renewable Energy, 24 July 2024 (names TEDA as the agency solarising Government buildings in Tamil Nadu)
- PVGIS, European Commission Joint Research Centre (solar output model)
- TNERC (Grid Interactive Solar PV Energy Generating Systems) Regulations, 2021, notified 7 October 2021 (Tamil Nadu Government Gazette, 20 October 2021); TANGEDCO salient features of TNERC generic tariff order No. 8 of 2021 dated 22 October 2021; TNPDCL rooftop solar page 'Policies Adopted'
- TNERC suo-motu tariff order No. 6 of 2025, dated 30 June 2025 (TNPDCL, FY 2025-26, effective 1 July 2025), paragraph 3.1.1 and tariff table
- TNPDCL profile page
- Tamilnadu Electricity Regulatory Commission