Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Tamil Nadu. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Tamil Nadu at a glance for solar projects
| Electricity regulator | Tamil Nadu Electricity Regulatory Commission (TNERC) |
|---|---|
| State renewable energy agency | Tamil Nadu Energy Development Agency (TEDA) |
| Electricity distribution | TNPDCL (The whole state of Tamil Nadu. TNPDCL is the former TANGEDCO and was renamed on 27 June 2024.) |
| Rooftop metering for businesses | Net metering for homes only; commercial and industrial users get net billing (net feed-in) up to the sanctioned load or 999 kW |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Tamil Nadu
In Tamil Nadu, net metering is open only to domestic consumers. Commercial and industrial consumers, at any voltage, can install rooftop solar under net billing (also called net feed-in) up to their sanctioned load or contract demand, or 999 kW, whichever is lower. The rules are in the TNERC Grid Interactive Solar PV Energy Generating Systems Regulations, 2021, which apply to loads of less than 1 MW.
- Under net billing, imports are billed at the retail tariff and exports are credited at the feed-in tariff fixed by TNERC. A surplus credit carries over to the next billing cycle. At the end of the settlement period on 31 March the consumer can take payment for the net credit or carry it over.
- Gross metering is open to consumers other than domestic and to generators, for systems of 151 kW to 999 kW. The whole output is sold to the distribution company at the feed-in tariff, through a separate line to the nearest HT network. Low-tension consumers are not eligible for gross metering.
- The levelised feed-in tariffs in the generic tariff order of 22 October 2021 are ₹3.61 per kWh for 1 to 10 kW, ₹3.37 per kWh for 11 to 150 kW and ₹3.10 per kWh for 151 to 999 kW.
- The plant may not be larger than the sanctioned load or contract demand. The solar systems under net metering or net billing connected to one distribution transformer together may not exceed 90% of that transformer's capacity.
- Network charges apply to the total units generated under net billing. TNPDCL's rooftop solar page shows ₹1.04 per kWh for consumers above 150 kW and ₹1.60 per kWh for other low-tension consumers. Gross metering pays no network charge.
- TNPDCL's rooftop solar page says that for HT consumers above 1 MW, approvals are given to run the plant in parallel with the grid, with reverse power relays.
- No rule on group or virtual net metering was found in the regulations. A draft of new Grid Interactive Solar PV regulations was published for comments in June 2024. The TNERC list of final regulations shows only the 2021 regulations.
What a plant produces in Tamil Nadu
Solar output changes across Tamil Nadu with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,330 to 1,500 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Ambattur | 1,360 | 1,360 |
| Avadi | 1,360 | 1,360 |
| Chennai | 1,390 | 1,390 |
| Coimbatore | 1,360 | 1,360 |
| Dindigul | 1,340 | 1,350 |
| Erode | 1,370 | 1,370 |
| Hosur | 1,410 | 1,410 |
| Kallakurichi | 1,330 | 1,340 |
| Kanchipuram | 1,350 | 1,350 |
| Karur | 1,390 | 1,390 |
| Madurai | 1,330 | 1,340 |
| Nagercoil | 1,500 | 1,500 |
| Ooty | 1,390 | 1,400 |
| Ranipet | 1,340 | 1,340 |
| Salem | 1,370 | 1,380 |
| Sivakasi | 1,370 | 1,370 |
| Thanjavur | 1,330 | 1,330 |
| Thoothukudi | 1,470 | 1,470 |
| Tiruchirappalli | 1,350 | 1,360 |
| Tirunelveli | 1,410 | 1,410 |
| Tiruppur | 1,390 | 1,390 |
| Vellore | 1,340 | 1,350 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in Tamil Nadu
Is net metering available for factories and commercial buildings in Tamil Nadu?
In Tamil Nadu, net metering is open only to domestic consumers. Commercial and industrial consumers, at any voltage, can install rooftop solar under net billing (also called net feed-in) up to their sanctioned load or contract demand, or 999 kW, whichever is lower. The rules are in the TNERC Grid Interactive Solar PV Energy Generating Systems Regulations, 2021, which apply to loads of less than 1 MW.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Tamil Nadu
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- PIB, Ministry of New and Renewable Energy, 24 July 2024 (names TEDA as the agency solarising Government buildings in Tamil Nadu)
- PVGIS, European Commission Joint Research Centre (solar output model)
- TNERC (Grid Interactive Solar PV Energy Generating Systems) Regulations, 2021, notified 7 October 2021 (Tamil Nadu Government Gazette, 20 October 2021); TANGEDCO salient features of TNERC generic tariff order No. 8 of 2021 dated 22 October 2021; TNPDCL rooftop solar page 'Policies Adopted'
- TNERC suo-motu tariff order No. 6 of 2025, dated 30 June 2025 (TNPDCL, FY 2025-26, effective 1 July 2025) (paragraphs 1.1.10 and 1.1.11); TNPDCL profile page (tnpdcl.org)