Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Tiruchirappalli, Tamil Nadu.

Tiruchirappalli at a glance for solar projects

District and stateTiruchirappalli district, Tamil Nadu
Electricity supplyTamil Nadu Power Distribution Corporation Limited (TNPDCL, formerly TANGEDCO) is the state distribution company and supplies Tiruchirappalli district.
Electricity regulatorTamil Nadu Electricity Regulatory Commission (TNERC)
State renewable energy agencyTamil Nadu Energy Development Agency (TEDA)
Rooftop metering for businessesNet metering for homes only; commercial and industrial users get net billing (net feed-in) up to the sanctioned load or 999 kW
Modelled solar outputabout 1,350 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1990 km from Tiruchirappalli in a straight line

Solar services in Tiruchirappalli

Tiruchirappalli: industrial areas

SIPCOT, the State Industries Promotion Corporation of Tamil Nadu, lists SIPCOT Industrial Park,Tiruchirapalli (Elanthapatti & Sooriyur Villages) among its industrial areas in Tiruchirappalli district.

The Government of India's One District One Product (ODOP) list names Engineering Products and Leather Products as the products of Tiruchirappalli district.

Solar output in Tiruchirappalli

A solar plant in Tiruchirappalli is modelled to produce about 1,350 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-I Industries, Factories, IT services energy charge of ₹7.50 per kWh (TNERC suo-motu tariff order No. 6 of 2025, dated 30 June 2025, in force from 1 July 2025). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹608 per kVA per month also applies. It is charged on the recorded kVA demand or 90% of the contract demand, whichever is higher. Energy used from 6 AM to 10 AM and from 6 PM to 10 PM is billed at 25% extra, and energy used from 10 PM to 5 AM gets a 5% reduction. The rates exclude electricity tax and duty. TNPDCL is the only licensee named in the order. The order says its tariffs stay valid until the next order.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.50 per kWh
100 kW1.4 lakh units1,000 sq m₹10.1 lakh
500 kW6.8 lakh units5,000 sq m₹50.6 lakh
1 MW13.5 lakh units10,000 sq m₹1.01 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Tiruchirappalli

For a rooftop array in Tiruchirappalli the strongest month is March, at about 136 units for each kW installed, and the weakest is November, at about 89. For a ground-mounted array at a 11° tilt the strongest month is March (about 135) and the weakest is November (about 89). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January117118
February122122
March136135
April125125
May122122
June109109
July107107
August111111
September114114
October107108
November8989
December9697

Somaya Solar projects near Tiruchirappalli

These are the Somaya Solar projects closest to Tiruchirappalli, with straight-line distances. They are shown as references and are not in Tiruchirappalli unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1460 km from Tiruchirappalli. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1900 km from Tiruchirappalli. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 2010 km from Tiruchirappalli. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Tiruchirappalli

Which electricity company handles solar connections in Tiruchirappalli?

Tamil Nadu Power Distribution Corporation Limited (TNPDCL, formerly TANGEDCO) is the state distribution company and supplies Tiruchirappalli district.

Is net metering available for factories and commercial buildings in Tiruchirappalli?

Net metering for homes only; commercial and industrial users get net billing (net feed-in) up to the sanctioned load or 999 kW. The rule is the same across Tamil Nadu.

How much electricity does a solar plant generate in Tiruchirappalli?

About 1,350 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.5 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Tiruchirappalli?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1990 km from Tiruchirappalli in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1460 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Tiruchirappalli

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.