Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Madurai, Tamil Nadu.
Madurai at a glance for solar projects
| District and state | Madurai district, Tamil Nadu |
|---|---|
| Electricity supply | Tamil Nadu Power Distribution Corporation Limited (TNPDCL, formerly TANGEDCO) is the state distribution company and supplies Madurai district. |
| Electricity regulator | Tamil Nadu Electricity Regulatory Commission (TNERC) |
| State renewable energy agency | Tamil Nadu Energy Development Agency (TEDA) |
| Rooftop metering for businesses | Net metering for homes only; commercial and industrial users get net billing (net feed-in) up to the sanctioned load or 999 kW |
| Modelled solar output | about 1,330 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 2080 km from Madurai in a straight line |
Solar services in Madurai
- Solar EPC Company in Madurai
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Madurai
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Madurai
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Madurai
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Madurai
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Madurai
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Madurai
The Government of India's One District One Product (ODOP) list names Readymade Garments as the product of Madurai district.
Solar output in Madurai
A solar plant in Madurai is modelled to produce about 1,330 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-I Industries, Factories, IT services energy charge of ₹7.50 per kWh (TNERC suo-motu tariff order No. 6 of 2025, dated 30 June 2025, in force from 1 July 2025). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. A demand charge of ₹608 per kVA per month also applies. It is charged on the recorded kVA demand or 90% of the contract demand, whichever is higher. Energy used from 6 AM to 10 AM and from 6 PM to 10 PM is billed at 25% extra, and energy used from 10 PM to 5 AM gets a 5% reduction. The rates exclude electricity tax and duty. TNPDCL is the only licensee named in the order. The order says its tariffs stay valid until the next order.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.50 per kWh |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹10.0 lakh |
| 500 kW | 6.7 lakh units | 5,000 sq m | ₹49.9 lakh |
| 1 MW | 13.3 lakh units | 10,000 sq m | ₹99.8 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Madurai
For a rooftop array in Madurai the strongest month is March, at about 135 units for each kW installed, and the weakest is November, at about 90. For a ground-mounted array at a 12° tilt the strongest month is March (about 134) and the weakest is November (about 90). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 119 | 119 |
| February | 122 | 122 |
| March | 135 | 134 |
| April | 121 | 122 |
| May | 117 | 118 |
| June | 103 | 104 |
| July | 102 | 103 |
| August | 108 | 109 |
| September | 112 | 112 |
| October | 106 | 106 |
| November | 90 | 90 |
| December | 98 | 99 |
Somaya Solar projects near Madurai
These are the Somaya Solar projects closest to Madurai, with straight-line distances. They are shown as references and are not in Madurai unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1570 km from Madurai. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 2010 km from Madurai. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 2110 km from Madurai. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Madurai
Which electricity company handles solar connections in Madurai?
Tamil Nadu Power Distribution Corporation Limited (TNPDCL, formerly TANGEDCO) is the state distribution company and supplies Madurai district.
Is net metering available for factories and commercial buildings in Madurai?
Net metering for homes only; commercial and industrial users get net billing (net feed-in) up to the sanctioned load or 999 kW. The rule is the same across Tamil Nadu.
How much electricity does a solar plant generate in Madurai?
About 1,330 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.3 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Madurai?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 2080 km from Madurai in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1570 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Madurai
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, "Details of Urban Local bodies and Areas under ..." (List-of-ULB.pdf), row: State | District code | District | City code | ULB name | ULB type
- PIB, Ministry of New and Renewable Energy, 24 July 2024 (names TEDA as the agency solarising Government buildings in Tamil Nadu)
- PVGIS, European Commission Joint Research Centre (solar output model)
- TNERC (Grid Interactive Solar PV Energy Generating Systems) Regulations, 2021, notified 7 October 2021 (Tamil Nadu Government Gazette, 20 October 2021); TANGEDCO salient features of TNERC generic tariff order No. 8 of 2021 dated 22 October 2021; TNPDCL rooftop solar page 'Policies Adopted'
- TNERC suo-motu tariff order No. 6 of 2025, dated 30 June 2025 (TNPDCL, FY 2025-26, effective 1 July 2025), paragraph 3.1.1 and tariff table
- TNPDCL profile page
- Tamilnadu Electricity Regulatory Commission