Metering rules for business rooftops in Tamil Nadu
In Tamil Nadu, net metering is open only to domestic consumers. Commercial and industrial consumers, at any voltage, can install rooftop solar under net billing (also called net feed-in) up to their sanctioned load or contract demand, or 999 kW, whichever is lower. The rules are in the TNERC Grid Interactive Solar PV Energy Generating Systems Regulations, 2021, which apply to loads of less than 1 MW.
- Under net billing, imports are billed at the retail tariff and exports are credited at the feed-in tariff fixed by TNERC. A surplus credit carries over to the next billing cycle. At the end of the settlement period on 31 March the consumer can take payment for the net credit or carry it over.
- Gross metering is open to consumers other than domestic and to generators, for systems of 151 kW to 999 kW. The whole output is sold to the distribution company at the feed-in tariff, through a separate line to the nearest HT network. Low-tension consumers are not eligible for gross metering.
- The levelised feed-in tariffs in the generic tariff order of 22 October 2021 are ₹3.61 per kWh for 1 to 10 kW, ₹3.37 per kWh for 11 to 150 kW and ₹3.10 per kWh for 151 to 999 kW.
- The plant may not be larger than the sanctioned load or contract demand. The solar systems under net metering or net billing connected to one distribution transformer together may not exceed 90% of that transformer's capacity.
- Network charges apply to the total units generated under net billing. TNPDCL's rooftop solar page shows ₹1.04 per kWh for consumers above 150 kW and ₹1.60 per kWh for other low-tension consumers. Gross metering pays no network charge.
- TNPDCL's rooftop solar page says that for HT consumers above 1 MW, approvals are given to run the plant in parallel with the grid, with reverse power relays.
- No rule on group or virtual net metering was found in the regulations. A draft of new Grid Interactive Solar PV regulations was published for comments in June 2024. The TNERC list of final regulations shows only the 2021 regulations.
Output and bill value for a rooftop plant in Tamil Nadu
Solar output changes across Tamil Nadu with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,330 to 1,500 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Ambattur | 1,360 | 1,360 |
| Avadi | 1,360 | 1,360 |
| Chennai | 1,390 | 1,390 |
| Coimbatore | 1,360 | 1,360 |
| Dindigul | 1,340 | 1,350 |
| Erode | 1,370 | 1,370 |
| Hosur | 1,410 | 1,410 |
| Kallakurichi | 1,330 | 1,340 |
| Kanchipuram | 1,350 | 1,350 |
| Karur | 1,390 | 1,390 |
| Madurai | 1,330 | 1,340 |
| Nagercoil | 1,500 | 1,500 |
| Ooty | 1,390 | 1,400 |
| Ranipet | 1,340 | 1,340 |
| Salem | 1,370 | 1,380 |
| Sivakasi | 1,370 | 1,370 |
| Thanjavur | 1,330 | 1,330 |
| Thoothukudi | 1,470 | 1,470 |
| Tiruchirappalli | 1,350 | 1,360 |
| Tirunelveli | 1,410 | 1,410 |
| Tiruppur | 1,390 | 1,390 |
| Vellore | 1,340 | 1,350 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Questions about solar projects in Tamil Nadu
Is net metering available for factories and commercial buildings in Tamil Nadu?
In Tamil Nadu, net metering is open only to domestic consumers. Commercial and industrial consumers, at any voltage, can install rooftop solar under net billing (also called net feed-in) up to their sanctioned load or contract demand, or 999 kW, whichever is lower. The rules are in the TNERC Grid Interactive Solar PV Energy Generating Systems Regulations, 2021, which apply to loads of less than 1 MW.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Tamil Nadu
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- PVGIS, European Commission Joint Research Centre (solar output model)
- TNERC (Grid Interactive Solar PV Energy Generating Systems) Regulations, 2021, notified 7 October 2021 (Tamil Nadu Government Gazette, 20 October 2021); TANGEDCO salient features of TNERC generic tariff order No. 8 of 2021 dated 22 October 2021; TNPDCL rooftop solar page 'Policies Adopted'