Somaya Solar Solutions Limited is an EPC contractor for PM-KUSUM solar plants. No PM-KUSUM capacity is reported for Aya Nagar, Delhi. This page sets out what the scheme covers, the position in Aya Nagar, and what we do on such a project where the scheme runs.
What PM-KUSUM covers
PM-KUSUM is a central government scheme of the Ministry of New and Renewable Energy, run in each state by state implementing agencies. Capacity is allotted to states on demand. The Ministry told the Lok Sabha on 29 July 2026 that the scheme's timeline is extended to 31 March 2027 for all components.
- Component A: decentralised solar plants of up to 2 MW on farmers' land.
- Component B: solar pumps for agriculture.
- Component C: solarisation of grid-connected agriculture pumps, including feeder-level solarisation.
Who runs PM-KUSUM in Delhi
No PM-KUSUM capacity is reported for Delhi. On 21 July 2026 the central government told the Lok Sabha that it had received no proposal or demand from Delhi's State Implementing Agency for an allocation under PM-KUSUM.
- Delhi is not listed in the state-wise progress tables for PM-KUSUM that the Ministry of New and Renewable Energy gave the Lok Sabha on 29 July 2026, which show progress up to 30 June 2026.
- PM-KUSUM is demand driven: capacity is allocated on the demand received from states and union territories. The scheme runs until 31 March 2027.
- Delhi's solar policy encourages solar plants on agricultural land through group net metering and community solar.
For land or pumps in Aya Nagar, the electricity supplier is the one to check first: BSES Rajdhani Power Limited (BRPL) supplies Aya Nagar, which the cited source places in its supply area.
What a PM-KUSUM plant produces in Aya Nagar
A solar plant in Aya Nagar is modelled to produce about 1,510 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (32°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 500 kW | 7.5 lakh units | 2 to 2.5 acres |
| 1 MW | 15.1 lakh units | 4 to 5 acres |
| 2 MW | 30.2 lakh units | 8 to 10 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What Somaya Solar does on a PM-KUSUM plant
Somaya Solar works as the EPC contractor for the farmer, developer or group that holds the allocation. It does not allot capacity or decide subsidy.
- Site check of the land and its distance from the substation
- Plant design and equipment supply
- Installation, testing and commissioning
- The line to the substation and coordination with the electricity supplier
- Support with the documents the implementing agency asks for
More detail: PM-KUSUM across India.
PM-KUSUM plants built by Somaya Solar
These are the Somaya Solar projects closest to Aya Nagar, with straight-line distances. They are shown as references and are not in Aya Nagar unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 140 km from Aya Nagar. In progress. Site access was difficult and was handled with local support.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 610 km from Aya Nagar. Completed, including the transmission line work coordinated with the local distribution company.
Questions about solar projects in Aya Nagar
Which electricity company handles solar connections in Aya Nagar?
BSES Rajdhani Power Limited (BRPL) supplies Aya Nagar, which the cited source places in its supply area.
How much electricity does a solar plant generate in Aya Nagar?
About 1,510 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.1 lakh units a year. A site study gives the figure to plan on.
Who do I apply to for PM-KUSUM in Delhi?
No PM-KUSUM capacity is reported for Delhi. On 21 July 2026 the central government told the Lok Sabha that it had received no proposal or demand from Delhi's State Implementing Agency for an allocation under PM-KUSUM.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Aya Nagar?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 40 km from Aya Nagar in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 140 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Aya Nagar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- BRPL: source naming Aya Nagar within its supply area
- GeoNames (place coordinates, CC BY 4.0)
- Lok Sabha Unstarred Question 1613, answered 29 July 2026 (Ministry of New and Renewable Energy)
- Lok Sabha Unstarred Question 397, answered 21 July 2026 (Ministry of Agriculture and Farmers Welfare), and Lok Sabha Unstarred Question 1613, answered 29 July 2026 (Ministry of New and Renewable Energy)
- PVGIS, European Commission Joint Research Centre (solar output model)