Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Aya Nagar, Delhi. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.

Aya Nagar at a glance for solar projects

District and stateSouth district, Delhi
Electricity supplyBSES Rajdhani Power Limited (BRPL) supplies Aya Nagar, which the cited source places in its supply area.
Electricity regulatorDelhi Electricity Regulatory Commission (DERC)
State renewable energy agencyEnergy Efficiency and Renewable Energy Management Centre, Department of Power, Government of NCT of Delhi (EE&REM Centre)
State solar policyDelhi Solar Energy Policy, 2023 (notified 14 March 2024; valid until 31 March 2030 unless replaced earlier)
Rooftop metering for businessesNet metering from 1 kWp, with plant size linked to the sanctioned load
Modelled solar outputabout 1,420 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 40 km from Aya Nagar in a straight line

What our EPC scope covers

An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.

  • Site survey and a study of your electricity use and bills
  • Plant design, drawings and equipment selection
  • Supply of modules, inverters, mounting structures and electrical equipment
  • Installation, testing and commissioning
  • Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
  • Operation and maintenance after handover, where contracted

More detail: Solar EPC Company across India.

Connecting a plant to the grid in Aya Nagar

In Delhi, rooftop solar connects under net metering. DERC's Net Metering for Renewable Energy Regulations, 2014 apply to consumers who buy electricity from a distribution licensee, and the solar policy confirms that this includes commercial and industrial consumers. The plant must be at least 1 kWp. Its size is subject to the sanctioned load, the capacity of the service line and the feasibility of connecting to the grid.

  • The 2014 regulations provide net metering only. They have no separate net billing or gross metering arrangement.
  • A plant larger than the sanctioned load is allowed if the consumer pays the difference in Service Line cum Development charges.
  • Each distribution licensee must offer at least 20% of the rated capacity of a distribution transformer for net-metered plants.
  • Surplus units carry forward to the next billing period as energy credit. Credits left at the end of the financial year are paid by the licensee at rates notified by DERC.
  • Group net metering is open to all consumers, and since 20 January 2026 virtual net metering is too. A ground-mounted plant under either may be up to 5 times the sanctioned load of the participating consumers, with a maximum of 10 MW. Rooftop plants have no cap. Plants commissioned by 31 March 2027 under these guidelines pay no wheeling charge, banking charge or cross-subsidy surcharge for their useful life.
  • Peer-to-peer trading of rooftop solar power is allowed under DERC's 2024 guidelines for consumers and prosumers with a sanctioned load or contract demand of up to 200 kW. Ground-mounted projects are excluded.
  • Latest amendment: the Net Metering (Second Amendment) Guidelines of 16 July 2026. The process is now online and in two stages. The licensee must grant connectivity within 25 days for plants above 10 kW, not counting the time the consumer takes to install the plant.

In Aya Nagar the application for connection and metering goes to BRPL.

What a plant produces in Aya Nagar

A solar plant in Aya Nagar is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial energy charge of ₹7.75 per kVAh (DERC Tariff Order for FY 2021-22, dated 30 September 2021, in force from 1 October 2021 and still the prevailing order in November 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The tariff schedule has one Industrial category, with the same rate in the BRPL, BYPL, TPDDL and NDMC areas. A fixed charge of ₹250 per kVA per month also applies. Supply at 11 kV gets a 3% rebate on energy charges. Time-of-day rates apply to consumers other than domestic with a sanctioned load of 10 kW/11 kVA or more. BRPL, BYPL and TPDDL bills also carry surcharges of 8% and 7% on fixed and energy charges, and a fuel and power purchase adjustment surcharge (FPPAS).

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.75 per kVAh
100 kW1.4 lakh units1,000 sq m₹11.0 lakh
500 kW7.1 lakh units5,000 sq m₹55.0 lakh
1 MW14.2 lakh units10,000 sq m₹1.10 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Local points for solar projects in Aya Nagar

The Government of India's One District One Product (ODOP) list names Tourism (Medical & Religious) and Hospitality Services as the products of South district.

EPC projects by Somaya Solar near Aya Nagar

These are the Somaya Solar projects closest to Aya Nagar, with straight-line distances. They are shown as references and are not in Aya Nagar unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 140 km from Aya Nagar. In progress. Site access was difficult and was handled with local support.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 190 km from Aya Nagar. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 190 km from Aya Nagar. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Aya Nagar

Which electricity company handles solar connections in Aya Nagar?

BSES Rajdhani Power Limited (BRPL) supplies Aya Nagar, which the cited source places in its supply area.

Is net metering available for factories and commercial buildings in Aya Nagar?

In Delhi, rooftop solar connects under net metering. DERC's Net Metering for Renewable Energy Regulations, 2014 apply to consumers who buy electricity from a distribution licensee, and the solar policy confirms that this includes commercial and industrial consumers. The plant must be at least 1 kWp. Its size is subject to the sanctioned load, the capacity of the service line and the feasibility of connecting to the grid.

How much electricity does a solar plant generate in Aya Nagar?

About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Aya Nagar?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 40 km from Aya Nagar in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 140 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Aya Nagar

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image