Somaya Solar Solutions Limited is an EPC contractor for PM-KUSUM solar plants. This page sets out how the scheme works for land and pumps in Balangir, Odisha and what we do on such a project.
What PM-KUSUM covers
PM-KUSUM is a central government scheme of the Ministry of New and Renewable Energy, run in each state by state implementing agencies. Capacity is allotted to states on demand. The Ministry told the Lok Sabha on 29 July 2026 that the scheme's timeline is extended to 31 March 2027 for all components. The three parts of the scheme are set out on our PM-KUSUM page.
Who runs PM-KUSUM in Odisha
In Odisha the four distribution companies run Component A and Component C: the power purchase agreements for Component A are signed by the distribution company, GRIDCO and the plant owner. OREDA ran the tender for vendors under Component B (standalone solar pumps).
The targets, tariffs and application details for Odisha are on the page PM-KUSUM in Odisha.
For land or pumps in Balangir, the electricity supplier is the one to check first: TP Western Odisha Distribution Limited (TPWODL) supplies electricity in Balangir district, one of the districts it lists as its area.
What a PM-KUSUM plant produces in Balangir
A solar plant in Balangir is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (26°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 500 kW | 6.8 lakh units | 2 to 2.5 acres |
| 1 MW | 13.6 lakh units | 4 to 5 acres |
| 2 MW | 27.2 lakh units | 8 to 10 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What Somaya Solar does on a PM-KUSUM plant
Somaya Solar works as the EPC contractor for the farmer, developer or group that holds the allocation. It does not allot capacity or decide subsidy.
- Site check of the land and its distance from the substation
- Plant design and equipment supply
- Installation, testing and commissioning
- The line to the substation and coordination with the electricity supplier
- Support with the documents the implementing agency asks for
More detail: PM-KUSUM across India.
PM-KUSUM plants built by Somaya Solar
These are the Somaya Solar projects closest to Balangir, with straight-line distances. They are shown as references and are not in Balangir unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 470 km from Balangir. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1040 km from Balangir. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Balangir
Which electricity company handles solar connections in Balangir?
TP Western Odisha Distribution Limited (TPWODL) supplies electricity in Balangir district, one of the districts it lists as its area.
How much electricity does a solar plant generate in Balangir?
About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.
Who do I apply to for PM-KUSUM in Odisha?
In Odisha the four distribution companies run Component A and Component C: the power purchase agreements for Component A are signed by the distribution company, GRIDCO and the plant owner. OREDA ran the tender for vendors under Component B (standalone solar pumps).
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Balangir?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1070 km from Balangir in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 470 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Balangir
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- Lok Sabha Unstarred Question 1613, answered 29 July 2026 (Ministry of New and Renewable Energy)
- Lok Sabha Unstarred Question 1613, answered 29 July 2026 (Ministry of New and Renewable Energy); OERC common tariff order of 24 March 2026; OREDA tender call for PM-KUSUM B
- OERC common tariff order for TPNODL, TPWODL, TPCODL and TPSODL for 2026-27, 24 March 2026, Table 1 licensed areas (txt-jhod/oerc-discom-order-2627.txt)
- PVGIS, European Commission Joint Research Centre (solar output model)