Somaya Solar Solutions Limited is an EPC contractor for PM-KUSUM solar plants. This page sets out how the scheme works for land and pumps in Ballari, Karnataka and what we do on such a project.

What PM-KUSUM covers

PM-KUSUM is a central government scheme of the Ministry of New and Renewable Energy, run in each state by state implementing agencies. Capacity is allotted to states on demand. The Ministry told the Lok Sabha on 29 July 2026 that the scheme's timeline is extended to 31 March 2027 for all components. The three parts of the scheme are set out on our PM-KUSUM page.

Who runs PM-KUSUM in Karnataka

In Karnataka, An undated item on KREDL's website describes a plan to solarise agricultural feeders under Component C covering 2.5 lakh pumpsets: 1.75 lakh in BESCOM, 65,000 in HESCOM and 10,000 in CESC. KREDL's website also carries the Component B helpline and tracking of applications. No capacity is reported under Component A.

The targets, tariffs and application details for Karnataka are on the page PM-KUSUM in Karnataka.

For land or pumps in Ballari, the electricity supplier is the one to check first: Gulbarga Electricity Supply Company Limited (GESCOM) supplies electricity in Ballari district, one of the districts it lists as its area.

What a PM-KUSUM plant produces in Ballari

A solar plant in Ballari is modelled to produce about 1,400 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (20°).

Plant sizeModelled output a yearLand needed (typical)
500 kW7.0 lakh units2 to 2.5 acres
1 MW14.0 lakh units4 to 5 acres
2 MW28.0 lakh units8 to 10 acres

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

What Somaya Solar does on a PM-KUSUM plant

Somaya Solar works as the EPC contractor for the farmer, developer or group that holds the allocation. It does not allot capacity or decide subsidy.

  • Site check of the land and its distance from the substation
  • Plant design and equipment supply
  • Installation, testing and commissioning
  • The line to the substation and coordination with the electricity supplier
  • Support with the documents the implementing agency asks for

More detail: PM-KUSUM across India.

PM-KUSUM plants built by Somaya Solar

These are the Somaya Solar projects closest to Ballari, with straight-line distances. They are shown as references and are not in Ballari unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1030 km from Ballari. Completed, including the transmission line work coordinated with the local distribution company.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1540 km from Ballari. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Ballari

Which electricity company handles solar connections in Ballari?

Gulbarga Electricity Supply Company Limited (GESCOM) supplies electricity in Ballari district, one of the districts it lists as its area.

How much electricity does a solar plant generate in Ballari?

About 1,400 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.0 lakh units a year. A site study gives the figure to plan on.

Who do I apply to for PM-KUSUM in Karnataka?

In Karnataka, An undated item on KREDL's website describes a plan to solarise agricultural feeders under Component C covering 2.5 lakh pumpsets: 1.75 lakh in BESCOM, 65,000 in HESCOM and 10,000 in CESC. KREDL's website also carries the Component B helpline and tracking of applications. No capacity is reported under Component A.

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based, and how far is that from Ballari?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1500 km from Ballari in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1030 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Ballari

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image