Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Ballari, Karnataka.
Ballari at a glance for solar projects
| District and state | Ballari district, Karnataka |
|---|---|
| Electricity supply | Gulbarga Electricity Supply Company Limited (GESCOM) supplies electricity in Ballari district, one of the districts it lists as its area. |
| Electricity regulator | Karnataka Electricity Regulatory Commission (KERC) |
| State renewable energy agency | Karnataka Renewable Energy Development Limited (KREDL) |
| State solar policy | Karnataka Renewable Energy Policy 2022-2027 (valid five years from gazette issue on 6 May 2022, or until a new policy is announced) |
| Rooftop metering for businesses | Net metering up to the sanctioned load or 1,000 kW, whichever is lower |
| Modelled solar output | about 1,390 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1500 km from Ballari in a straight line |
Solar services in Ballari
- Solar EPC Company in Ballari
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Ballari
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Ballari
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Ballari
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Ballari
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Ballari
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Ballari
The Government of India's One District One Product (ODOP) list names Steel and Allied activities and Bellary Denim Jeans as the products of Ballari district.
Solar output in Ballari
A solar plant in Ballari is modelled to produce about 1,390 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-2(a) Industrial, rate the Tariff Order 2025 fixes for FY2026-27 energy charge of ₹6.60 per kWh (KERC Combined Tariff Order 2025 for the ESCOMs, dated 27 March 2025 (FY2025-26 to FY2027-28), and KERC review order of 3 March 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The Tariff Order 2025 fixes the HT-2(a) energy charge for FY2026-27 at 660 paise per kWh, with a demand charge of ₹350 per kVA per month. KERC's review order of 3 March 2026 re-fixed HT-2(a) for FY2025-26 at ₹6.70 per unit and ₹365 per kVA. It does not say what applies for FY2026-27; the table uses the ₹6.60 the Tariff Order 2025 fixes for that year. The same HT-2(a) schedule applies to all five distribution companies. A time-of-day tariff applies (plus 100 paise at 06:00-09:00 and 18:00-22:00 and minus 100 paise at 22:00-06:00, December to June). BESCOM consumers also pay an FY25 true-up charge per unit from May 2026 to April 2027. Confirm the rate with the distribution company.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.60 per kWh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.2 lakh |
| 500 kW | 7.0 lakh units | 5,000 sq m | ₹45.9 lakh |
| 1 MW | 13.9 lakh units | 10,000 sq m | ₹91.7 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Ballari
For a rooftop array in Ballari the strongest month is March, at about 145 units for each kW installed, and the weakest is July, at about 86. For a ground-mounted array at a 20° tilt the strongest month is January (about 146) and the weakest is July (about 81). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 135 | 146 |
| February | 131 | 138 |
| March | 145 | 146 |
| April | 132 | 129 |
| May | 130 | 123 |
| June | 100 | 94 |
| July | 86 | 81 |
| August | 92 | 89 |
| September | 98 | 97 |
| October | 113 | 117 |
| November | 108 | 115 |
| December | 119 | 130 |
Somaya Solar projects near Ballari
These are the Somaya Solar projects closest to Ballari, with straight-line distances. They are shown as references and are not in Ballari unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1030 km from Ballari. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1450 km from Ballari. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1540 km from Ballari. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Ballari
Which electricity company handles solar connections in Ballari?
Gulbarga Electricity Supply Company Limited (GESCOM) supplies electricity in Ballari district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Ballari?
Net metering up to the sanctioned load or 1,000 kW, whichever is lower. The rule is the same across Karnataka.
How much electricity does a solar plant generate in Ballari?
About 1,390 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.9 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Ballari?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1500 km from Ballari in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1030 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Ballari
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GESCOM website, O&M Divisions
- GeoNames (place coordinates, CC BY 4.0)
- KERC (Grid Interactive Distributed Solar Photovoltaic (DSPV) Plants) Regulations, 2026 (notification of 19 August 2026) and KERC generic tariff order of 25 August 2026
- KERC Combined Tariff Order 2025 for the ESCOMs, dated 27 March 2025
- Karnataka Electricity Regulatory Commission
- Karnataka Renewable Energy Policy 2022-2027, Energy Department notification of 16 April 2022 (Karnataka Gazette, 6 May 2022)
- MoHUA PMAY-Urban, "Details of Urban Local bodies and Areas under ..." (List-of-ULB.pdf), row: State | District code | District | City code | ULB name | ULB type
- PVGIS, European Commission Joint Research Centre (solar output model)