Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Nandyal, Andhra Pradesh.
Nandyal at a glance for solar projects
| District and state | Nandyal district, Andhra Pradesh |
|---|---|
| Electricity supply | Southern Power Distribution Company of Andhra Pradesh Limited (APSPDCL) supplies electricity in Nandyal district, one of the districts it lists as its area. |
| Electricity regulator | Andhra Pradesh Electricity Regulatory Commission (APERC) |
| State renewable energy agency | New & Renewable Energy Development Corporation of Andhra Pradesh Limited (NREDCAP) |
| State solar policy | Andhra Pradesh Integrated Clean Energy Policy, 2024 (G.O.Ms.No.37, 30 October 2024) |
| Rooftop metering for businesses | Net metering up to 500 kWp; net billing up to 1,000 kWp; each within contracted demand |
| Modelled solar output | about 1,340 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1470 km from Nandyal in a straight line |
Solar services in Nandyal
- Solar EPC Company in Nandyal
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Nandyal
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Nandyal
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Nandyal
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Nandyal
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Nandyal
One contract from survey to a working plant, with approvals and handover included.
Nandyal: industrial areas
APIIC, the Andhra Pradesh Industrial Infrastructure Corporation, lists IE(exp)-NANDYAL, Ie-Nandyal and Nandyal-Iidc among its industrial areas in Nandyal district.
The Government of India's One District One Product (ODOP) list names Allagadda Stone Carving as the product of Nandyal district.
Solar output in Nandyal
A solar plant in Nandyal is modelled to produce about 1,340 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industry (General), HT-III(A), 11 kV supply energy charge of ₹6.30 per kVAh (APERC retail supply tariff order for FY 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is for normal hours (3 PM to 6 PM and 10 PM to midnight). The table shows the billing unit as kWh/kVAh. Time-of-day rates apply: in 11 kV supply, off-peak (10 AM to 3 PM and midnight to 6 AM) is ₹5.55. Peak (6 AM to 10 AM and 6 PM to 10 PM) is ₹7.80 in the high-demand months (April and May, September and October, February and March) and ₹7.30 in the other months. Normal-hour rates at other voltages: ₹5.85 at 33 kV, ₹5.40 at 132 kV and ₹5.35 at 220 kV. A demand charge of ₹475 per kVA per month also applies. The tariff excludes electricity duty, fuel and power purchase cost adjustment (FPPCA), true-up and other recoveries. The same schedule applies to APSPDCL, APCPDCL and APEPDCL.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.30 per kVAh |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹8.4 lakh |
| 500 kW | 6.7 lakh units | 5,000 sq m | ₹42.2 lakh |
| 1 MW | 13.4 lakh units | 10,000 sq m | ₹84.4 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Nandyal
For a rooftop array in Nandyal the strongest month is March, at about 141 units for each kW installed, and the weakest is July, at about 87. For a ground-mounted array at a 20° tilt the strongest month is March (about 142) and the weakest is July (about 82). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 128 | 138 |
| February | 126 | 133 |
| March | 141 | 142 |
| April | 129 | 126 |
| May | 126 | 120 |
| June | 101 | 95 |
| July | 87 | 82 |
| August | 91 | 88 |
| September | 95 | 94 |
| October | 108 | 112 |
| November | 101 | 107 |
| December | 112 | 122 |
Somaya Solar projects near Nandyal
These are the Somaya Solar projects closest to Nandyal, with straight-line distances. They are shown as references and are not in Nandyal unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 950 km from Nandyal. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1390 km from Nandyal. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1490 km from Nandyal. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Nandyal
Which electricity company handles solar connections in Nandyal?
Southern Power Distribution Company of Andhra Pradesh Limited (APSPDCL) supplies electricity in Nandyal district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Nandyal?
Net metering up to 500 kWp; net billing up to 1,000 kWp; each within contracted demand. The rule is the same across Andhra Pradesh.
How much electricity does a solar plant generate in Nandyal?
About 1,340 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.4 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Nandyal?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1470 km from Nandyal in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 950 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Nandyal
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- APERC final order dated 22 February 2024 on the APERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulation, 2023 (Regulation 4 of 2023)
- APERC retail supply tariff order for FY 2026-27, dated 25 March 2026
- APERC retail supply tariff order for FY 2026-27, dated 25 March 2026 (Chapter XI, Table 11)
- APIIC, List of APIIC Industrial Parks, Undeveloped Lands (UDL) & Private Industrial Parks in Andhra Pradesh
- APSPDCL recruitment notification, 24 June 2026
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- G.O.Ms.No.26, Energy (Power-II) Department, 28 February 2025, operational guidelines for the Andhra Pradesh Integrated Clean Energy Policy, 2024
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, "Details of Urban Local bodies and Areas under ..." (List-of-ULB.pdf), row: State | District code | District | City code | ULB name | ULB type
- PVGIS, European Commission Joint Research Centre (solar output model)