Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Hubballi, Karnataka.

Hubballi at a glance for solar projects

District and stateDharwad district, Karnataka
Electricity supplyHubli Electricity Supply Company Limited (HESCOM) supplies electricity in Dharwad district, one of the districts it lists as its area.
Electricity regulatorKarnataka Electricity Regulatory Commission (KERC)
State renewable energy agencyKarnataka Renewable Energy Development Limited (KREDL)
State solar policyKarnataka Renewable Energy Policy 2022-2027 (valid five years from gazette issue on 6 May 2022, or until a new policy is announced)
Rooftop metering for businessesNet metering up to the sanctioned load or 1,000 kW, whichever is lower
Modelled solar outputabout 1,370 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1500 km from Hubballi in a straight line

Solar services in Hubballi

Local points for solar projects in Hubballi

The Government of India's One District One Product (ODOP) list names FMCG and Volve Mfg as the products of Dharwad district.

Solar output in Hubballi

A solar plant in Hubballi is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-2(a) Industrial, rate the Tariff Order 2025 fixes for FY2026-27 energy charge of ₹6.60 per kWh (KERC Combined Tariff Order 2025 for the ESCOMs, dated 27 March 2025 (FY2025-26 to FY2027-28), and KERC review order of 3 March 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The Tariff Order 2025 fixes the HT-2(a) energy charge for FY2026-27 at 660 paise per kWh, with a demand charge of ₹350 per kVA per month. KERC's review order of 3 March 2026 re-fixed HT-2(a) for FY2025-26 at ₹6.70 per unit and ₹365 per kVA. It does not say what applies for FY2026-27; the table uses the ₹6.60 the Tariff Order 2025 fixes for that year. The same HT-2(a) schedule applies to all five distribution companies. A time-of-day tariff applies (plus 100 paise at 06:00-09:00 and 18:00-22:00 and minus 100 paise at 22:00-06:00, December to June). BESCOM consumers also pay an FY25 true-up charge per unit from May 2026 to April 2027. Confirm the rate with the distribution company.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.60 per kWh
100 kW1.4 lakh units1,000 sq m₹9.0 lakh
500 kW6.8 lakh units5,000 sq m₹45.2 lakh
1 MW13.7 lakh units10,000 sq m₹90.4 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Hubballi

For a rooftop array in Hubballi the strongest month is March, at about 144 units for each kW installed, and the weakest is July, at about 77. For a ground-mounted array at a 21° tilt the strongest month is January (about 151) and the weakest is July (about 72). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January137151
February132140
March144146
April131127
May128119
June8882
July7772
August8582
September9392
October113117
November114123
December126139

Somaya Solar projects near Hubballi

These are the Somaya Solar projects closest to Hubballi, with straight-line distances. They are shown as references and are not in Hubballi unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1090 km from Hubballi. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1480 km from Hubballi. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1550 km from Hubballi. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Hubballi

Which electricity company handles solar connections in Hubballi?

Hubli Electricity Supply Company Limited (HESCOM) supplies electricity in Dharwad district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Hubballi?

Net metering up to the sanctioned load or 1,000 kW, whichever is lower. The rule is the same across Karnataka.

How much electricity does a solar plant generate in Hubballi?

About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Hubballi?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1500 km from Hubballi in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1090 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Hubballi

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image